Difference between revisions of "TPO Roof System Details"
Difference between revisions of "TPO Roof System Details"
Line 9: | Line 9: | ||
<hr> | <hr> | ||
+ | |||
+ | :'''NOTE''': The following pages are currently under construction | ||
:[[TPO Details:D3.7.1 Assemblies (Insulated Conventional)|D3.7.1 Assemblies (Insulated Conventional)(Under Construction)]] | :[[TPO Details:D3.7.1 Assemblies (Insulated Conventional)|D3.7.1 Assemblies (Insulated Conventional)(Under Construction)]] |
Revision as of 18:43, 19 July 2016
- D3.7.1 Mechanically Attached Generic Conventional Assembly
- D3.7.2 Fully Adhered
- D3.7.3 Ballasted Protected Membrane
- D3.7.4 Curb Opening
- D3.7.5 Clamping Copper Drain
- D3.7.6 Two-Part Box Flashing
- D3.7.7 Mechanical Curb Opening
- D3.7.8 Roof Edge
- NOTE: The following pages are currently under construction
- D3.7.1 Assemblies (Insulated Conventional)(Under Construction)
- D3.7.2 Assemblies (Protected Membrane)(Under Construction)
- D3.7.3 Parapets & Copings (High - Wall Supported)(Under Construction)
- D3.7.4 Parapets & Copings (Parapet - Wall Transition)(Under Construction)
- D3.7.5 Edges & Fascia (Cant Edge)(Under Construction)
- D3.7.6 Edges & Fascia (Gravel Stop)(Under Construction)
- D3.7.7 Edges & Fascia (Flat Edge Termination)(Under Construction)
- D3.7.8 Counter-flashings & Reglets (Deck - Wall Supported)(Under Construction)
- D3.7.9 Counter-flashings & Reglets (Deck - Unsupported by Wall)(Under Construction)
- D3.7.10 Counter-flashings & Reglets (Stucco Wall: Re-roofing)(Under Construction)
- D3.7.11 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
- D3.7.12 Counter-flashings & Reglets (Double Surface Reglet)(Under Construction)
- D3.7.13 Counter-flashings & Reglets (Low Door Sill)(Under Construction)
- D3.7.14 Counter-flashings & Reglets (Window Curb)(Under Construction)
- D3.7.15 Roof-Wall Transitions (Expansion Joint)(Under Construction)
- D3.7.16 Roof-Wall Transitions (Divider/Control Joint)(Under Construction)
- D3.7.17 Roof-Wall Transitions (Fire Separation Joint)(Under Construction)
- D3.7.18 Roof-Wall Transitions (Fire Separation Wall)(Under Construction)
- D3.7.19 Curbs & Sleepers (Equipment Sleeper)(Under Construction)
- D3.7.20 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)
- D3.7.21 Curbs & Sleepers (Basic Curb)(Under Construction)
- D3.7.22 Curbs & Sleepers (Mechanical Opening)(Under Construction)
- D3.7.23 Curbs & Sleepers (Pre-curb for Planters)(Under Construction)
- D3.7.24 Strip-in Flashings (Metal Plumbing)(Under Construction)
- D3.7.25 Strip-in Flashings (Two-part Cable)(Under Construction)
- D3.7.26 Strip-in Flashings (Pourable Sealer Pocket)(Under Construction)
- D3.7.27 Water & Drainage (Cast Iron Drain)(Under Construction)
- D3.7.28 Water & Drainage (Spun Copper Drain)(Under Construction)
- D3.7.29 Water & Drainage (Clamping Spun Copper Drain)(Under Construction)
- D3.7.30 Water & Drainage (Open Wall Scupper)(Under Construction)
- D3.7.31 Water & Drainage (Through-wall Scupper)(Under Construction)
- D3.7.32 Miscellaneous Penetrations (Roof Anchor)(Under Construction)
- D3.7.33 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)(Under Construction)
- D3.7.34 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)(Under Construction)