Difference between revisions of "Template:All Systems - MATERIALS"

Jump to: navigation, search

Difference between revisions of "Template:All Systems - MATERIALS"

Line 1: Line 1:
Materials must be acceptable to the RoofStar Guarantee Program. A listing is published in this manual (see link above).  
+
All roofing components must be supplied or accepted by the membrane manufacturer and must be acceptable to the RoofStar Guarantee Program. A listing is published in this manual (see link above).  
  
 
All materials must be protected from weather by properly stacking above ground or roof surface and in factory packaging or other adequate covering, approved or recommended by the manufacturer, until applied.  All installed roofing materials that are susceptible to moisture damage must be made watertight by the end of each work day.
 
All materials must be protected from weather by properly stacking above ground or roof surface and in factory packaging or other adequate covering, approved or recommended by the manufacturer, until applied.  All installed roofing materials that are susceptible to moisture damage must be made watertight by the end of each work day.
 
All roofing components must be supplied or accepted by the membrane manufacturer. See Manufacturers' components listed in the [[Section:C. Accepted Materials|Accepted Materials]] section of this Manual.
 

Revision as of 21:42, 25 July 2016

All roofing components must be supplied or accepted by the membrane manufacturer and must be acceptable to the RoofStar Guarantee Program. A listing is published in this manual (see link above).

All materials must be protected from weather by properly stacking above ground or roof surface and in factory packaging or other adequate covering, approved or recommended by the manufacturer, until applied. All installed roofing materials that are susceptible to moisture damage must be made watertight by the end of each work day.