Difference between revisions of "SBS Tall Parapet"
Difference between revisions of "SBS Tall Parapet"
(→RELATED WORK BY OTHERS) |
|||
Line 3: | Line 3: | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | (1) | + | ;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Overlay Board''']]: If required by design authority. |
− | + | ;(2) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSVAPOUR|'''Vapour Retarder''']]: If required by design authority. | |
− | (2) | + | ;(3) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual. |
− | + | ;(4) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATIONOVERLAY|'''Insulation Overlay Board''']]: As required. | |
− | (3) | + | ;(5) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''Primary Membrane and Membrane Protection''']] |
− | + | ;(6) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''Base Sheet Flashing''']]: Mechanically fasten to parapet at termination. | |
− | (4) | + | ;(7) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSMETAL|'''Base Metal Flashing''']]: Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See '''Section 12.6 - Cap Flashings, Base Flashings and Reglet'''s. |
− | + | ;(8) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSMETAL|'''Metal Counter Flashing''']]: Minimum 250 mm (10") above roof surface. | |
− | (5) | + | ;(9) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSMETAL|'''Metal Cap Flashing''']]: Required whenever the primary roof membrane flashing/stripping is carried over the top of parapet walls. See '''Section 12.6 - Cap Flashings, Base Flashings and Reglets'''. |
− | |||
− | (6) | ||
− | |||
− | (7) | ||
− | |||
− | (8) | ||
− | |||
− | (9) | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | (A) | + | ;(A) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STEELDECK|'''Acceptable Deck''']] |
− | + | ;(B) '''Air / Vapour Seal''' | |
− | (B) | + | ;(C) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSWALLSUB|'''Acceptable Wall Surface''']] |
− | + | ;(D) '''Wood Blocking''' | |
− | (C) | + | ;(E) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSLOPEDWOODBLOCKING|'''Sloped Wood Blocking''']]: Required over 100 mm (4") parapet width. |
− | + | ;(F) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''Wall Sheathing Membrane''']]: Minimum 1 mm (0.040") self-adhered modified bitumen. | |
− | (D) | + | ;(G) '''Exterior Wall Finish''' |
− | + | ;(H) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Cap Flashing''']]: Required by others whenever the primary roof membrane is not carried over top of the parapet and/or when the wall finish is by others. (Unless specified otherwise). | |
− | (E) | + | ;(I) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Cap Flashing Underlay''']]:Minimum 1 mm (0.040" or 40 mil) self-adhered modified bitumen. |
− | |||
− | (F) | ||
− | |||
− | (G) | ||
− | |||
− | (H) | ||
− | |||
− | (I) | ||
Revision as of 20:58, 29 July 2016
1 WORK INCLUDED
- (1) Gypsum Overlay Board
- If required by design authority.
- (2) Vapour Retarder
- If required by design authority.
- (3) Insulation
- See available insulation products in the Accepted Materials section of this Manual.
- (4) Insulation Overlay Board
- As required.
- (5) Primary Membrane and Membrane Protection
- (6) Base Sheet Flashing
- Mechanically fasten to parapet at termination.
- (7) Base Metal Flashing
- Optional on flexible membrane systems. Required on assemblies using gravel ballast filter mats. See Section 12.6 - Cap Flashings, Base Flashings and Reglets.
- (8) Metal Counter Flashing
- Minimum 250 mm (10") above roof surface.
- (9) Metal Cap Flashing
- Required whenever the primary roof membrane flashing/stripping is carried over the top of parapet walls. See Section 12.6 - Cap Flashings, Base Flashings and Reglets.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Air / Vapour Seal
- (C) Acceptable Wall Surface
- (D) Wood Blocking
- (E) Sloped Wood Blocking
- Required over 100 mm (4") parapet width.
- (F) Wall Sheathing Membrane
- Minimum 1 mm (0.040") self-adhered modified bitumen.
- (G) Exterior Wall Finish
- (H) Metal Cap Flashing
- Required by others whenever the primary roof membrane is not carried over top of the parapet and/or when the wall finish is by others. (Unless specified otherwise).
- (I) Cap Flashing Underlay
- Minimum 1 mm (0.040" or 40 mil) self-adhered modified bitumen.
NOTE: Refer to RGC Guarantee Standards for additional requirements.