(Created page with "File:10.3.2.2.jpg === WORK INCLUDED === (1) <b>Vapor Retarder: </b>If required by design authority (2) <b>Insulation:</b> See list of accepted materials in Section 2.2...") |
|||
Line 2: | Line 2: | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | (1) | + | ;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSVAPOUR|'''Vapour Retarder''']]: If required by design authority |
− | + | ;(2) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual. | |
− | (2) | + | ;(3) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATIONOVERLAY|'''Insulation Overlay Board''']]: Where required. |
− | + | ;(4) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''Primary Membrane and Membrane Protection''']]: Mechanically fasten to outside face of fascia (C). | |
− | (3) | + | ;(5) '''Mastic:''' Trowel coating of compatible mastic. |
− | + | ;(6) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Edge/Gravel-stop Flashing''']]: Minimum 100 mm (4") flange onto roof membrane, eave stop maximum 25 mm (1") high: embed in mastic and mechanically fasten alternately between centre and edge of flange at 100 mm (4") o/c; lap flashing 100 mm (4") minimum. | |
− | (4) | + | ;(7) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''Membrane Flashing''']]: Asphalt and gravel roofing systems, 2 overlapping plies of a minimum 2 mm reinforced SBS modified bitumen base sheet or minimum 180 g / m² polyester felt. For flexible membrane systems, refer to manufacturer’s application details and RGC Guarantee Standards. |
− | + | ;(8) <b>Asphalt:</b> For asphalt and gravel built-up roofing systems only. | |
− | (5) | + | ;(9) <b>Gravel:</b> For asphalt and gravel built-up roofing systems only. |
− | |||
− | (6) | ||
− | |||
− | (7) | ||
− | |||
− | (8) <b>Asphalt:</b> For asphalt and gravel built-up roofing systems only. | ||
− | |||
− | (9) <b>Gravel:</b> For asphalt and gravel built-up roofing systems only. | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | (A) | + | ;(A) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSDECKS|'''Acceptable Deck''']] |
− | + | ;(B) <b>Wood Blocking</b> | |
− | (B) <b>Wood Blocking</b> | + | ;(C) <b>Wood Fascia</b> |
− | |||
− | (C) <b>Wood Fascia</b> | ||
'''NOTE''': Refer to <i>RGC Guarantee Standards</i> for additional requirements. | '''NOTE''': Refer to <i>RGC Guarantee Standards</i> for additional requirements. |
Revision as of 22:31, 29 July 2016
1 WORK INCLUDED
- (1) Vapour Retarder
- If required by design authority
- (2) Insulation
- See available insulation products in the Accepted Materials section of this Manual.
- (3) Insulation Overlay Board
- Where required.
- (4) Primary Membrane and Membrane Protection
- Mechanically fasten to outside face of fascia (C).
- (5) Mastic: Trowel coating of compatible mastic.
- (6) Metal Edge/Gravel-stop Flashing
- Minimum 100 mm (4") flange onto roof membrane, eave stop maximum 25 mm (1") high: embed in mastic and mechanically fasten alternately between centre and edge of flange at 100 mm (4") o/c; lap flashing 100 mm (4") minimum.
- (7) Membrane Flashing
- Asphalt and gravel roofing systems, 2 overlapping plies of a minimum 2 mm reinforced SBS modified bitumen base sheet or minimum 180 g / m² polyester felt. For flexible membrane systems, refer to manufacturer’s application details and RGC Guarantee Standards.
- (8) Asphalt: For asphalt and gravel built-up roofing systems only.
- (9) Gravel: For asphalt and gravel built-up roofing systems only.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Wood Blocking
- (C) Wood Fascia
NOTE: Refer to RGC Guarantee Standards for additional requirements.