Difference between revisions of "SBS Metal Edge Termination"

Jump to: navigation, search

Difference between revisions of "SBS Metal Edge Termination"

(WORK INCLUDED)
Line 11: Line 11:
 
;(8) <b>Asphalt:</b>  For asphalt and gravel built-up roofing systems only.
 
;(8) <b>Asphalt:</b>  For asphalt and gravel built-up roofing systems only.
 
;(9) <b>Gravel:</b>  For asphalt and gravel built-up roofing systems only.
 
;(9) <b>Gravel:</b>  For asphalt and gravel built-up roofing systems only.
 +
 +
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===

Revision as of 19:01, 4 August 2016

10.3.2.2.jpg

1 WORK INCLUDED

(1) Vapour Retarder
If required by design authority
(2) Insulation
See available insulation products in the Accepted Materials section of this Manual.
(3) Insulation Overlay Board
Where required.
(4) Primary Membrane and Membrane Protection
Mechanically fasten to outside face of fascia (C).
(5) Mastic: Trowel coating of compatible mastic.
(6) Metal Edge/Gravel-stop Flashing
Minimum 100 mm (4") flange onto roof membrane, eave stop maximum 25 mm (1") high: embed in mastic and mechanically fasten alternately between centre and edge of flange at 100 mm (4") o/c; lap flashing 100 mm (4") minimum.
(7) Membrane Flashing
Asphalt and gravel roofing systems, 2 overlapping plies of a minimum 2 mm reinforced SBS modified bitumen base sheet or minimum 180 g / m² polyester felt. For flexible membrane systems, refer to manufacturer’s application details and RGC Guarantee Standards.
(8) Asphalt: For asphalt and gravel built-up roofing systems only.
(9) Gravel: For asphalt and gravel built-up roofing systems only.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Wood Blocking
(C) Wood Fascia

NOTE: Refer to RGC Guarantee Standards for additional requirements.





Back to SBS Application

Back to SBS Construction Details

Back to Construction Details