=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
(1) <b>Gypsum Overlay Board: </b>If required by design authority.
+
;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Deck Overlay''']]: If required by design authority.
 +
;(2) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSVAPOUR|'''Vapour Retarder''']]: If required by design authority
 +
;(3) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATION|'''Insulation''']]: Mechanically fastened.  See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
 +
;(4) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATIONOVERLAY|'''Insulation Overlay Board''']]: As required.
 +
;(5) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''Primary Membrane and Membrane Protection''']]
 +
;(6) '''Compatible Mastic''': Use only the membrane manufacturer's approved sealant.
 +
;(7) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSGUM|'''Gum Pan or Pitch Pocket''']]: Minimum 100 mm (4") flange onto roof membrane. All corners, with the exception of one job-site formed double standing seam corner joint and adjoining lapped flange joining, shall be closed and soldered. Minimum height of gum pan to be 100 mm (4").
 +
;(8) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''Membrane Flashing''']]: Onto primed metal flashing flange.
 +
;(9) '''Packing''': To prevent displacement of compatible mastic.
 +
;(10) '''Structural Sealant''': Use only the membrane manufacturers&#8217; approved proprietary polyurethane based structural sealant.
 +
;(11) '''Back-up Storm Collar''': To be installed whenever practical. Caulk at top of collar.
  
(2) <b>Vapour Retarder:</b> If required by design authority.
+
<hr>
 
 
(3) <b>Insulation:</b> See list of accepted materials in Section 2.2.
 
 
 
(4) <b>Insulation Overlay:</b> As required. See <i>RGC Guarantee Standard B4.1, B4.2 and C4.1</i>
 
 
 
(5) <b>Primary Membrane and Membrane Protection</b>
 
 
 
(6) <b>Compatible Mastic:</b> Use only the membrane manufacturers&#8217; approved sealant.
 
 
 
(7) <b>Metal Gum Pan or Pitch Pocket:</b> Minimum 100 mm (4") flange onto roof membrane. All corners, with the exception of one job-site formed double standing seam corner joint and adjoining lapped flange joining, shall be closed and soldered. Minimum height of gum pan to be 100 mm (4"). See <i>RGC Guarantee Standard A6.2</i>
 
 
 
(8) <b>Membrane Flashing:</b> Onto primed metal flashing flange.
 
 
 
(9) <b>Packing:</b> To prevent displacement of compatible mastic.
 
 
 
(10) <b>Structural Sealant:</b> Use only the membrane manufacturers&#8217; approved proprietary polyurethane based structural sealant.
 
 
 
(11) <b>Back-up Storm Collar:</b> To be installed whenever practical. Caulk at top of collar.
 
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
(A) <b>Acceptable Deck</b>
+
;(A) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSDECKS|'''Acceptable Deck''']]
 
+
;(B) '''Protrusion'''
(B)<b> Protrusion</b>
+
;(C) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSWOODBLOCKING|'''Wood Blocking''']]
 
 
(C)<b> Wood Blocking</b>
 
  
  

Revision as of 19:09, 5 August 2016

10.3.5.4.jpg

1 WORK INCLUDED

(1) Gypsum Deck Overlay
If required by design authority.
(2) Vapour Retarder
If required by design authority
(3) Insulation
Mechanically fastened. See available insulation products in the Accepted Materials section of this Manual.
(4) Insulation Overlay Board
As required.
(5) Primary Membrane and Membrane Protection
(6) Compatible Mastic
Use only the membrane manufacturer's approved sealant.
(7) Gum Pan or Pitch Pocket
Minimum 100 mm (4") flange onto roof membrane. All corners, with the exception of one job-site formed double standing seam corner joint and adjoining lapped flange joining, shall be closed and soldered. Minimum height of gum pan to be 100 mm (4").
(8) Membrane Flashing
Onto primed metal flashing flange.
(9) Packing
To prevent displacement of compatible mastic.
(10) Structural Sealant
Use only the membrane manufacturers’ approved proprietary polyurethane based structural sealant.
(11) Back-up Storm Collar
To be installed whenever practical. Caulk at top of collar.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Protrusion
(C) Wood Blocking


NOTE: Refer to RGC Guarantee Standards for additional requirements.

  • WARNING: DO NOT USE THIS DETAIL WITH HOT PIPES.
  • AVOID THIS DETAIL: Wherever possible use Flanged Metal Stack Flashing or Curbed Opening (See Section 10.3).