Difference between revisions of "SBS Flanged Insert Drain (Clamping Ring)"

Jump to: navigation, search

Difference between revisions of "SBS Flanged Insert Drain (Clamping Ring)"

(RELATED WORK BY OTHERS)
Line 4: Line 4:
  
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) Gypsum Board:
+
;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSUBSTRATES|'''Gypsum Deck Overlay''']]: Required when insulation is too thin to span flutes of steel decking or when required as thermal barrier by design authority.
:Required when insulation is too thin to span flutes of steel decking or as thermal barrier when specified by the design authority. (See <i>RGC Guarantee Standard A2.5</i>)
+
;(2) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSVAPOUR|'''Vapour Retarder''']]: If required by design authority.
;(2) Vapor Retarder:
+
;(3) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATION|'''Insulation''']]: Mechanically fastened. See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
:If required by design authority.
+
;(4) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATIONOVERLAY|'''Insulation Overlay Board''']]: Asphalt adhered or mechanically fastened. Two layers required over heat-sensitive insulation.
;(3) Insulation
+
;(5) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''Base Sheet''']]: Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer's specification and to <i>RoofStar Guarantee Standards</i>. Torching directly to wood surfaces is not permitted.
:Mechanically fastened where possible. (See Section 2.2 for accepted materials and<i> RGC Guarantee Standard A4.4).</i>
+
;(6) '''Mastic''': Compatible mastic accepted by the membrane manufacturer.
;(4) Overlay Board:
+
;(7) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''Base Sheet Flashing''']]: Adhered according to manufacturer's specifications and to <i>RoofStar Guarantee Standards.</i>
:Asphalt adhered or mechanically fastened. Two layers required over heat-sensitive insulation. (See <i>RGC Guarantee Standard C4.1</i>)
+
;(8) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''Cap Sheet''']]: Applied according to manufacturer's printed instructions and to <i>RoofStar Guarantee Standards</i>.
;(5) Base Sheet:
 
:Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer&#8217;s specification and to <i>RGC Guarantee Standards</i>. Torching directly to wood surfaces is not permitted.
 
;(6) Mastic:
 
:Compatible mastic accepted by the membrane manufacturer.
 
;(7) Base Sheet Flashing:
 
:Adhered according to manufacturer&#8217;s specifications and to <i>RGC Guarantee Standards.</i>
 
;(8) Cap Sheet:
 
:Applied according to manufacturer&#8217;s printed instructions and to <i>RGC Guarantee Standards</i>.
 
  
 +
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
(A) Acceptable Deck
+
;(A) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSDECKS|'''Acceptable Deck''']]
(B) Clamping Copper Drain:  
+
;(B) '''Clamping Copper Drain''': Primed and mechanically fastened. Installed in bed of compatible mastic.
Primed and mechanically fastened. Installed in bed of compatible mastic.
 
  
  
;NOTE:
+
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
:Refer to <i>RGC Guarantee Standards</i> for additional requirements.
+
* Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Sectionle 7.4.10.11 (Sectionle 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C.
:Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Sectionle 7.4.10.11 (Sectionle 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C.
 
  
  

Revision as of 21:00, 5 August 2016


D1.7.5.jpg


1 WORK INCLUDED

(1) Gypsum Deck Overlay
Required when insulation is too thin to span flutes of steel decking or when required as thermal barrier by design authority.
(2) Vapour Retarder
If required by design authority.
(3) Insulation
Mechanically fastened. See available insulation products in the Accepted Materials section of this Manual.
(4) Insulation Overlay Board
Asphalt adhered or mechanically fastened. Two layers required over heat-sensitive insulation.
(5) Base Sheet
Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer's specification and to RoofStar Guarantee Standards. Torching directly to wood surfaces is not permitted.
(6) Mastic
Compatible mastic accepted by the membrane manufacturer.
(7) Base Sheet Flashing
Adhered according to manufacturer's specifications and to RoofStar Guarantee Standards.
(8) Cap Sheet
Applied according to manufacturer's printed instructions and to RoofStar Guarantee Standards.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Clamping Copper Drain
Primed and mechanically fastened. Installed in bed of compatible mastic.


NOTE: Refer to RoofStar Guarantee Standards for additional requirements.

  • Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Sectionle 7.4.10.11 (Sectionle 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C.





Back to SBS Application

Back to SBS Construction Details

Back to Construction Details