Difference between revisions of "SBS Through-wall Scupper Drain"

Jump to: navigation, search

Difference between revisions of "SBS Through-wall Scupper Drain"

(Created page with "File:10.3.6.5.jpg === WORK INCLUDED === (1) <b>Vapour Retarder</b>: If required by design authority. (Optional terminations) (2) <b>Insulation:</b> See list of accepte...")
 
Line 2: Line 2:
  
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
(1) <b>Vapour Retarder</b>: If required by design authority. (Optional terminations)
+
;(1) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSVAPOUR|'''Vapour Retarder''']]: If required by design authority.
 +
;(2) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATION|'''Insulation''']]: See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
 +
;(3) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSINSULATIONOVERLAY|'''Insulation Overlay Board''']]: Where required.
 +
;(4) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSBASE|'''Primary Membrane and Membrane Protection''']]
 +
;(5) [[RoofStar Guarantee Standards for SBS Roof Systems#SBS-STRIPPING|'''Base Sheet Flashing''']]
 +
;(6) '''Metal Scupper with Hopper''': The outside face of scupper to be minimum 37.7mm (1&#189;") <b><u>lower</u></b><u> </u>than the box height with a 12.7mm (&#189;") drip edge. Installed in a bed of compatible mastic.  Interface between outside wall and scupper should be caulked with appropriate sealant.  Installed when wall finish is complete prior to completion of roofing or sheet metal (e.g.: re-roofing).
 +
;(7) '''Mastic''': Compatible with membrane
 +
;(8) '''Scupper Membrane Flashing''':
 +
;(9) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Base Metal Flashing''']]: Mechanically fastened (optional on flexible membrane systems).
 +
;(10) [[RoofStar Guarantee Standards for SBS Roof Systems#METALCAP-SBS|'''Metal Counter-flashing''']]: Into reglet approximately 30 mm (1 &#188;").
  
(2) <b>Insulation:</b>  See list of accepted materials in Section 2.2.
+
<hr>
 
 
(3) <b>Insulation Overlay</b>:  Where required. See <i>RGC Guarantee Standard B4.1, B4.2 </i>and<i> C4.1</i>
 
 
 
(4) <b>Primary Membrane and Membrane Protection</b>
 
 
 
(5) <b>Membrane Flashing</b>
 
 
 
(6) <b>Metal Scupper with Hopper: </b>The outside face of scupper to be minimum 37.7mm (1&#189;") <b><u>lower</u></b><u> </u>than the box height with a 12.7mm (&#189;") drip edge. Installed in a bed of compatible mastic.  Interface between outside wall and scupper should be caulked with appropriate sealant.  Installed when wall finish is complete prior to completion of roofing or sheet metal (e.g.: re-roofing).
 
 
 
(7) <b>Mastic:</b>  Compatible with membrane
 
 
 
(8) <b>Scupper Membrane Flashing:</b>
 
 
 
(9) <b>Metal Base Flashing:</b>  Mechanically fastened (optional on flexible membrane systems).
 
 
 
(10) <b>Metal Counter Flashing:</b> Into reglet approximately 30 mm (1 &#188;").
 
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
(A) <b>Acceptable Deck</b>
+
;(A) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSDECKS|'''Acceptable Deck''']]
 
+
;(B) '''Air / Vapour Seal'''
(B) <b>Air / Vapour Seal</b>
+
;(C) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSWOODBLOCKING|'''Wood Blocking''']]: Optional with insulation cant strips.
 
+
;(D) '''Plywood''':  If required by design authority. See <i>RGC Guarantee Standards</i>
(C) <b>Wood Blocking Assembly:</b> Optional with insulation cant strips.
+
;(E) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSWALLSUB|'''Wall Finish''']]: Interface between outside wall and scupper to be caulked with appropriate sealant. Installed by trade responsible for outside wall finish if roofing and metal flashing has been completed prior to exterior wall finish.
 
 
(D) <b>Plywood:</b> If required by design authority. See <i>RGC Guarantee Standards</i>
 
 
 
(E) <b>Exterior Wall Finish:</b> Interface between outside wall and scupper to be caulked with appropriate sealant. Installed by trade responsible for outside wall finish if roofing and metal flashing has been completed prior to exterior wall finish.
 
  
  
'''NOTE''': Refer to <i>RGC Guarantee Standards</i> for additional requirements.
+
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
  
  

Revision as of 21:16, 5 August 2016

10.3.6.5.jpg

1 WORK INCLUDED

(1) Vapour Retarder
If required by design authority.
(2) Insulation
See available insulation products in the Accepted Materials section of this Manual.
(3) Insulation Overlay Board
Where required.
(4) Primary Membrane and Membrane Protection
(5) Base Sheet Flashing
(6) Metal Scupper with Hopper
The outside face of scupper to be minimum 37.7mm (1½") lower than the box height with a 12.7mm (½") drip edge. Installed in a bed of compatible mastic. Interface between outside wall and scupper should be caulked with appropriate sealant. Installed when wall finish is complete prior to completion of roofing or sheet metal (e.g.: re-roofing).
(7) Mastic
Compatible with membrane
(8) Scupper Membrane Flashing
(9) Base Metal Flashing
Mechanically fastened (optional on flexible membrane systems).
(10) Metal Counter-flashing
Into reglet approximately 30 mm (1 ¼").

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Air / Vapour Seal
(C) Wood Blocking
Optional with insulation cant strips.
(D) Plywood
If required by design authority. See RGC Guarantee Standards
(E) Wall Finish
Interface between outside wall and scupper to be caulked with appropriate sealant. Installed by trade responsible for outside wall finish if roofing and metal flashing has been completed prior to exterior wall finish.


NOTE: Refer to RoofStar Guarantee Standards for additional requirements.





Back to SBS Application

Back to SBS Construction Details

Back to Construction Details