(→RELATED WORK BY OTHERS) |
|||
Line 19: | Line 19: | ||
;(B) '''Air / Vapour Seal''' | ;(B) '''Air / Vapour Seal''' | ||
;(C) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSWOODBLOCKING|'''Wood Blocking''']]: Optional with insulation cant strips. | ;(C) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSWOODBLOCKING|'''Wood Blocking''']]: Optional with insulation cant strips. | ||
− | ;(D) '''Plywood''': If required by design authority. See | + | ;(D) '''Plywood''': If required by design authority. See the ''RoofStar Guarantee Standards''. |
;(E) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSWALLSUB|'''Wall Finish''']]: Interface between outside wall and scupper to be caulked with appropriate sealant. Installed by trade responsible for outside wall finish if roofing and metal flashing has been completed prior to exterior wall finish. | ;(E) [[RoofStar Guarantee Standards for SBS Roof Systems#SBSWALLSUB|'''Wall Finish''']]: Interface between outside wall and scupper to be caulked with appropriate sealant. Installed by trade responsible for outside wall finish if roofing and metal flashing has been completed prior to exterior wall finish. | ||
Revision as of 22:29, 5 August 2016
1 WORK INCLUDED
- (1) Vapour Retarder
- If required by design authority.
- (2) Insulation
- See available insulation products in the Accepted Materials section of this Manual.
- (3) Insulation Overlay Board
- Where required.
- (4) Primary Membrane and Membrane Protection
- (5) Base Sheet Flashing
- (6) Metal Scupper with Hopper
- The outside face of scupper to be minimum 37.7mm (1½") lower than the box height with a 12.7mm (½") drip edge. Installed in a bed of compatible mastic. Interface between outside wall and scupper should be caulked with appropriate sealant. Installed when wall finish is complete prior to completion of roofing or sheet metal (e.g.: re-roofing).
- (7) Mastic
- Compatible with membrane
- (8) Scupper Membrane Flashing
- (9) Base Metal Flashing
- Mechanically fastened (optional on flexible membrane systems).
- (10) Metal Counter-flashing
- Into reglet approximately 30 mm (1 ¼").
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Air / Vapour Seal
- (C) Wood Blocking
- Optional with insulation cant strips.
- (D) Plywood
- If required by design authority. See the RoofStar Guarantee Standards.
- (E) Wall Finish
- Interface between outside wall and scupper to be caulked with appropriate sealant. Installed by trade responsible for outside wall finish if roofing and metal flashing has been completed prior to exterior wall finish.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.