Difference between revisions of "SBS Mechanical Equipment Curb"

Jump to: navigation, search

Difference between revisions of "SBS Mechanical Equipment Curb"

(RELATED WORK BY OTHERS)
Line 31: Line 31:
  
  
[[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''SBS Application'']]
+
[[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Application'']]
  
[[SBS Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''SBS Construction Details'']]
+
[[SBS Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Construction Details'']]
  
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
+
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 17:51, 8 August 2016

D1.7.7.jpg


1 WORK INCLUDED

(1) Gypsum Deck Overlay
Required when insulation is too thin to span flutes of steel decking or when required as thermal barrier by design authority.
(2) Vapour Retarder
If required by design authority.
(3) Insulation
Mechanically fastened. See available insulation products in the Accepted Materials section of this Manual.
(4) Insulation Overlay Board
As required.
(5) Base Sheet
Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer's specification. Torching directly to wood surfaces is not permitted.
(6) Base Sheet Flashing
Adhered according to manufacturer's specifications, using cold adhesive, hot asphalt, self-adhered or torch applied to cover boards, or mechanically attached membrane. Must be tucked under metal flange and mechanically attached to nailing strip.
(7) Cap Sheet
Applied according to manufacturer's printed instructions and to RoofStar Guarantee Standards.
(8) Cap Sheet Flashing
Applied according to manufacturer's printed instructions and to RoofStar Guarantee Standards. Must be tucked under metal flange and mechanically attached to the nailing strip.
(9) Metal Base Flashing
Mechanically fasten, standing seam at corners. Full width base flashing optional on flexible membranes. Partial skirt flashing minimum 75 mm (3") required on mechanical curbs that require flashing under metal flange.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Air / Vapour Seal
(C) Mechanical Curb
Minimum 200 mm (8") and maximum 300 mm (12") above finished roof surface.
(D) Rigid Insulation


NOTE: Refer to RoofStar Guarantee Standards for additional requirements.

  • Some mechanical curbs are designed to allow membrane flashing to be carried up onto metal flange. Install according to manufacturers’ instructions.





Back to SBS Application

Back to SBS Construction Details

Back to Construction Details