=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
 
+
;(1) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope.  
(1) <b>Underlayment</b>: The type of underlay required is determined by roof slope (see Section 8.1.4.1 and Section 8.1.4.2).  
+
;(2) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMSLIP|'''Slip Sheet''']]: Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.  
 
+
;(3) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMVALLEYPAN |'''Valley Metal Panel''']]: Lower, installed prior to the pipe flashing, cut hole large enough to allow for movement. Extend 400 mm (16") upslope beyond the pipe.  
(2) <b>Slip Sheet</b>: Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.  
+
;(4) '''Flashing''':  Flange set in two continuous beads of accepted caulking.  
 
+
;(5) '''Spaced Cleat''': Cleats, set in accepted caulking, spaced 50 mm (2") and fastened with compatible non-corrosive flat head screws.  
(3) <b>Architectural Metal Roof Panel</b>: Lower, installed prior to the pipe flashing, cut hole large enough to allow for movement. Extend 400 mm (16") upslope beyond the pipe.  
+
;(6) '''Architectural Metal Roof Panel''': Upper, installed after installation of pipe flashing.  Cut hole for pipe penetration and turn panel end under to accommodate cleats.  
 
+
;(7) '''Settle Cap''': Material must match flashing material.  
(4) <b>Flashing</b>:  Flange set in two continuous beads of accepted caulking.  
+
;(8) '''Caulking''': Bead of caulking tooled into transition between metal roof panel and flashing.  
 
+
;(9) '''Sealant Tape''': Two rows of sealant tape or acceptable caulking.  
(5) <b>Spaced Cleat</b>: Cleats, set in accepted caulking, spaced 50 mm (2") and fastened with compatible non-corrosive flat head screws.  
+
;(10) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMDRAG |'''Drag-load Fasteners''']]: Compatible non-corrosive fasteners.  
 
 
(6) <b>Architectural Metal Roof Panel</b>: Upper, installed after installation of pipe flashing.  Cut hole for pipe penetration and turn panel end under to accommodate cleats.  
 
 
 
(7) <b>Settle Cap</b>: Material must match flashing material.  
 
 
 
(8) <b>Caulking</b>: Bead of caulking tooled into transition between metal roof panel and flashing.  
 
 
 
(9) <b>Sealant Tape</b>: Two rows of sealant tape or acceptable caulking.  
 
 
 
(10) <b>Drag Load Fastening</b>: Compatible non-corrosive fasteners.  
 
  
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
 
+
;(A) [[RoofStar Guarantee Standards for ASM Roof Systems#ASMDECK|'''Acceptable Deck''']]
(A) <b>Acceptable Deck</b>
 
  
  
'''NOTE''': Refer to <i>RGC Guarantee Standards</i> for additional requirements.
+
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
 
 
  
 
<hr>
 
<hr>
Line 38: Line 26:
  
  
 +
[[Section:E. Application: Steep Slope Roofs|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Application'']]
  
[[Section:E. Application: Steep Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''ASM Application'']]
+
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']]
 
 
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''ASM Construction Details'']]
 
  
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
+
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Revision as of 17:54, 10 August 2016


ASM 11.1.2 Pipe Flashing, Split Panel.jpg


1 WORK INCLUDED

(1) Underlayment
The type of underlay required is determined by roof slope.
(2) Slip Sheet
Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
(3) Valley Metal Panel
Lower, installed prior to the pipe flashing, cut hole large enough to allow for movement. Extend 400 mm (16") upslope beyond the pipe.
(4) Flashing
Flange set in two continuous beads of accepted caulking.
(5) Spaced Cleat
Cleats, set in accepted caulking, spaced 50 mm (2") and fastened with compatible non-corrosive flat head screws.
(6) Architectural Metal Roof Panel
Upper, installed after installation of pipe flashing. Cut hole for pipe penetration and turn panel end under to accommodate cleats.
(7) Settle Cap
Material must match flashing material.
(8) Caulking
Bead of caulking tooled into transition between metal roof panel and flashing.
(9) Sealant Tape
Two rows of sealant tape or acceptable caulking.
(10) Drag-load Fasteners
Compatible non-corrosive fasteners.


2 RELATED WORK BY OTHERS

(A) Acceptable Deck


NOTE: Refer to RoofStar Guarantee Standards for additional requirements.