Difference between revisions of "TPO Roof System Details"

Jump to: navigation, search

Difference between revisions of "TPO Roof System Details"

Line 3: Line 3:
 
For further information about thermoplastic (TPO and PVC) membrane system designs and requirements, see '''[[TPO/PVC (Thermoplastic Membranes) Roof Systems]]'''.
 
For further information about thermoplastic (TPO and PVC) membrane system designs and requirements, see '''[[TPO/PVC (Thermoplastic Membranes) Roof Systems]]'''.
  
 
+
<div class="col-md-6">
 
:[[TPO Details:D3.7.1 Assemblies (Insulated Conventional)|D3.7.1 Assemblies (Insulated Conventional)]]
 
:[[TPO Details:D3.7.1 Assemblies (Insulated Conventional)|D3.7.1 Assemblies (Insulated Conventional)]]
 
:[[TPO Details:D3.7.2 Assemblies (Fully Adhered)|D3.7.2 Assemblies (Fully Adhered)]]
 
:[[TPO Details:D3.7.2 Assemblies (Fully Adhered)|D3.7.2 Assemblies (Fully Adhered)]]
Line 12: Line 12:
 
:[[TPO Details:D3.7.26 Strip-in Flashings (Two-part Cable)|D3.7.26 Strip-in Flashings (Two-part Cable)]]
 
:[[TPO Details:D3.7.26 Strip-in Flashings (Two-part Cable)|D3.7.26 Strip-in Flashings (Two-part Cable)]]
 
:[[TPO Details:D3.7.30 Water & Drainage (Clamping Spun Copper Drain)|D3.7.30 Water & Drainage (Clamping Spun Copper Drain)]]
 
:[[TPO Details:D3.7.30 Water & Drainage (Clamping Spun Copper Drain)|D3.7.30 Water & Drainage (Clamping Spun Copper Drain)]]
 
+
</div>
<hr>
+
<div class="col-md-6">
 
 
 
:'''NOTE''': The following pages are currently under construction
 
:'''NOTE''': The following pages are currently under construction
  
Line 44: Line 43:
 
:[[TPO Details:D3.7.34 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)|D3.7.34 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)(Under Construction)]]
 
:[[TPO Details:D3.7.34 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)|D3.7.34 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)(Under Construction)]]
 
:[[TPO Details:D2.7.35 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)|D3.7.35 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)(Under Construction)]]
 
:[[TPO Details:D2.7.35 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)|D3.7.35 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)(Under Construction)]]
 +
</div>
  
 
<hr>
 
<hr>

Revision as of 18:48, 19 August 2016

The drawings contained within this section are intended to represent a variety of thermoplastic roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult manufacturers’ specifications and RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and RGC.

For further information about thermoplastic (TPO and PVC) membrane system designs and requirements, see TPO/PVC (Thermoplastic Membranes) Roof Systems.

NOTE: The following pages are currently under construction
D3.7.4 Parapets & Copings (High - Wall Supported)(Under Construction)
D3.7.5 Parapets & Copings (Parapet - Wall Transition)(Under Construction)
D3.7.6 Edges & Fascia (Cant Edge)(Under Construction)
D3.7.7 Edges & Fascia (Gravel Stop)(Under Construction)
D3.7.9 Counter-flashings & Reglets (Deck - Wall Supported)(Under Construction)
D3.7.10 Counter-flashings & Reglets (Deck - Unsupported by Wall)(Under Construction)
D3.7.11 Counter-flashings & Reglets (Stucco Wall: Re-roofing)(Under Construction)
D3.7.12 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
D3.7.13 Counter-flashings & Reglets (Double Surface Reglet)(Under Construction)
D3.7.14 Counter-flashings & Reglets (Low Door Sill)(Under Construction)
D3.7.15 Counter-flashings & Reglets (Window Curb)(Under Construction)
D3.7.16 Roof-Wall Transitions (Expansion Joint)(Under Construction)
D3.7.17 Roof-Wall Transitions (Divider/Joint)(Under Construction)
D3.7.18 Roof-Wall Transitions (Fire Separation Joint)(Under Construction)
D3.7.19 Roof-Wall Transitions (Fire Separation Wall)(Under Construction)
D3.7.20 Curbs & Sleepers (Equipment Sleeper)(Under Construction)
D3.7.21 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)
D3.7.24 Curbs & Sleepers (Pre-curb for Planters)(Under Construction)
D3.7.25 Strip-in Flashings (Metal Plumbing)(Under Construction)
D3.7.27 Strip-in Flashings (Pourable Sealer Pocket)(Under Construction)
D3.7.28 Water & Drainage (Cast Iron Drain)(Under Construction)
D3.7.29 Water & Drainage (Spun Copper Drain)(Under Construction)
D3.7.31 Water & Drainage (Open Wall Scupper)(Under Construction)
D3.7.32 Water & Drainage (Through-wall Scupper)(Under Construction)
D3.7.33 Miscellaneous Penetrations (Roof Anchor)(Under Construction)
D3.7.34 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)(Under Construction)
D3.7.35 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)(Under Construction)



Back to TPO/PVC Roof Systems

Back to Construction Details Section