Difference between revisions of "SBS Fall Protection Anchor in Wall"
Difference between revisions of "SBS Fall Protection Anchor in Wall"
Line 1: | Line 1: | ||
+ | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | ||
+ | | colspan="2" | <big>To read '''''RoofStar Guarantee Standards''''' for any element in this illustration, click on the <span style="color:#6495ed">'''blue-linked'''</span> terms</big> | ||
+ | |} | ||
<div class="panel panel-success"> | <div class="panel panel-success"> | ||
<div class="panel-heading"><big>'''SBS Details'''</big></div> | <div class="panel-heading"><big>'''SBS Details'''</big></div> | ||
Line 31: | Line 34: | ||
<hr> | <hr> | ||
− | |||
− | |||
Revision as of 21:18, 25 August 2016
To read RoofStar Guarantee Standards for any element in this illustration, click on the blue-linked terms |
SBS Details
1 WORK INCLUDED
- (1) Conventional Roof Assembly
- (2) Metal Counter-flashing
- (3) Insulation
- See available insulation products in the Accepted Materials section of this Manual.
- (4) Primary Membrane and Membrane Flashing.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Wall Anchor
- to CSA Z91-M90; Concrete slab shown, see anchor manufacturer’s attachment for other wall types and attachment methods
- (C) Anchor Eye
- to CSA Z91-M90
- (D) Anchor Placement
- Minimum 200 mm (8") above finished roof surface.
- (E) Plywood
- 15.9 mm (5/8") treated where required.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.