Difference between revisions of "LMF Metal Cap Flashing (joints)"

Jump to: navigation, search

Difference between revisions of "LMF Metal Cap Flashing (joints)"

Line 1: Line 1:
 +
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
 +
| colspan="2"  | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big>
 +
|}
 
<div class="panel panel-success">
 
<div class="panel panel-success">
 
<div class="panel-heading"><big>'''Metal Flashing Details'''</big></div>
 
<div class="panel-heading"><big>'''Metal Flashing Details'''</big></div>
Line 13: Line 16:
 
(1) <b>Expansion: </b>Allowances should be made for expansion and contraction. Soldered joints are not acceptable.
 
(1) <b>Expansion: </b>Allowances should be made for expansion and contraction. Soldered joints are not acceptable.
  
(2) <b>Underlayment:</b> Membrane under cap flashing. See {{hilite | RGC Guarantee Standard A5.6 || 2016-November-19 }}
+
(2) <b>Underlayment:</b> Membrane under cap flashing. See, for example, [[RoofStar Guarantee Standards for SBS Roof Systems#SBSSTRIPTERM|'''SBS Roof Systems, 10.3 Application''']].
  
 
(3) <b>Clips: </b>Standing seams are fastened to wood blocking before applying the following length, using nails and clips.
 
(3) <b>Clips: </b>Standing seams are fastened to wood blocking before applying the following length, using nails and clips.
  
(4) <b>Fasteners: </b>S-locks and Double S-locks are nailed through the single leaf before applying the following length. See {{hilite | RGC Guarantee Standard A6.8 || 2016-November-19 }}
+
(4) <b>Fasteners: </b>S-locks and Double S-locks are nailed through the single leaf before applying the following length. See [[RoofStar Guarantee Standards for SBS Roof Systems#SBSMETALFLASH|'''SBS Roof Systems - 12. Perimeter Flashing: Metal''']].
 +
 
 +
(5) <b>Metal Cap Flashing: </b>Fastened with continuous concealed clips or cladding screws evenly spaced between seams. See [[RoofStar Guarantee Standards for SBS Roof Systems#SBSMETALFLASH|'''SBS Roof Systems - 12. Perimeter Flashing: Metal''']].
  
(5) <b>Metal Cap Flashing: </b>Fastened with continuous concealed clips or cladding screws evenly spaced between seams. See {{hilite | RGC Guarantee Standard A6.10 || 2016-November-19 }} for requirements.
 
  
  

Revision as of 16:33, 1 September 2016

RoofStar Guarantee Standards are blue-linked
Metal Flashing Details

10.2.1.jpg

END JOINTS in metal flashings are made using any one of the joints shown in this section, providing the following rules are complied with:

(1) Expansion: Allowances should be made for expansion and contraction. Soldered joints are not acceptable.

(2) Underlayment: Membrane under cap flashing. See, for example, SBS Roof Systems, 10.3 Application.

(3) Clips: Standing seams are fastened to wood blocking before applying the following length, using nails and clips.

(4) Fasteners: S-locks and Double S-locks are nailed through the single leaf before applying the following length. See SBS Roof Systems - 12. Perimeter Flashing: Metal.

(5) Metal Cap Flashing: Fastened with continuous concealed clips or cladding screws evenly spaced between seams. See SBS Roof Systems - 12. Perimeter Flashing: Metal.


Further detail on fastening of flashing is detailed in the SMACNA Manual referenced in Section 10.2.

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to Metal Flashing Details

Back to Construction Details