ASM Valley (Hooked)
ASM Valley (Hooked)
Revision as of 21:15, 24 April 2019 by James Klassen (talk | contribs) (James Klassen moved page ASM Details:E1.7.5 (Metal Valley - Hooked Flashing) to ASM 10.11 Hooked Valley Flashing)
RoofStar Guarantee Standards are blue-linked |
ASM Details
1 WORK INCLUDED
- (1) Architectural Metal Roof Panel
- (2) Valley Panel Overlap
- Set in two continuous rows of accepted caulking or sealant tape.
- (3) Slip Sheet
- Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
- (4) Underlayment
- The type of underlay required is determined by roof slope.
- (5) Membrane Strip-in
- Accepted self-adhered modified bituminous eave protection membrane.
- (6) Continuous Built-In Hook Strip
- (7) Fastening
- Metal valley panels to be secured with compatible, non-corrosive, flat head fasteners 200 mm (8") o/c. Metal roof panel to metal valley panel overlap must be a minimum of 125 mm (5").
- (8) Valley Protection Membrane
- Accepted self-adhered modified bituminous eave protection membrane.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
RoofStar Guarantee Standards for ASM Roof Assemblies