ASM 10.4.3 Ridge (Vented)
ASM 10.4.3 Ridge (Vented)
Revision as of 20:33, 19 August 2016 by James Klassen (talk | contribs)
ASM Details
1 WORK INCLUDED
- (1) Underlayment
- The type of underlay required is determined by roof slope.
- (2) Slip Sheet
- Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
- (7) Architectural Metal Roof Panel
- Turn up (bread panned) at termination and drag load fastened with compatible non-corrosive fasteners.
- (4) Metal Panel Clip
- Installed to metal roof panel manufacturer's printed instructions.
- (5) 'Z' Closure
- Set in accepted caulking and secured with compatible non-corrosive flat head fasteners.
- (6) Perforated Metal Screen
- (7) Continuous Cleat
- (8) Metal Cap Flashing
- Joints overlapped 100 mm (4") minimum, sealed with two rows of accepted caulking. Exposed edges must be turned under.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Wood Nailer
- (C) Air Space
- Determined by Design Authority.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.