ASM 10.4.3 Ridge (Vented)

Jump to: navigation, search

ASM 10.4.3 Ridge (Vented)

Revision as of 20:33, 19 August 2016 by James Klassen (talk | contribs)
ASM Details

8.1.4.13.1.jpg

1 WORK INCLUDED

(1) Underlayment
The type of underlay required is determined by roof slope.
(2) Slip Sheet
Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.
(7) Architectural Metal Roof Panel 
Turn up (bread panned) at termination and drag load fastened with compatible non-corrosive fasteners.
(4) Metal Panel Clip
Installed to metal roof panel manufacturer's printed instructions.
(5) 'Z' Closure
Set in accepted caulking and secured with compatible non-corrosive flat head fasteners.
(6) Perforated Metal Screen
(7) Continuous Cleat
(8) Metal Cap Flashing
Joints overlapped 100 mm (4") minimum, sealed with two rows of accepted caulking. Exposed edges must be turned under.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Wood Nailer
(C) Air Space
Determined by Design Authority.


NOTE: Refer to RoofStar Guarantee Standards for additional requirements.



Back to ASM Application

Back to ASM Construction Details

Back to Construction Details