1 WORK INCLUDED

(1) Primary Roof Membrane
Installed per RoofStar Guarantee Standards.
(2) Membrane Flashing
Carried up walls a minimum 200 mm (8") above roof surface. At window curbs membrane flashing must be 200mm (8") in height above the top of extruded polystyrene insulation or protection/drainage layer, extended under the window mullion (fenestration assembly) and carried to the inside edge of the curb. Membrane gussets must be installed at all corners and transitions.
(3) Protection/Drainage Layer - Insulation Surfacing
Assemblies to be determined by Design Authority. Paver systems are required to have proprietary pedestals that incorporate a minimum 3mm (1/8") gap between adjacent units. See additional RoofStar Guarantee Standards under 8.4.3 Protected and Modified Protected Membranes - Ballast.
(4) Metal Wall Flashing
Required on roof assemblies using gravel ballast, filter mats and drainage mediums at insulation /curb interfaces.

2 WORK BY OTHERS

(A) Acceptable Deck
Concrete slab shown
(B) Supporting Curb
Height varies depending on the insulation thickness and type of roof assembly.
(C) Metal Water Stop Flashing
Mechanically attached to the top of the window curb. Cut flashing to fit the opening and pan fold, weld, or solder seams at all corners and mitres.
(D) Metal Water Stop Flashing Seam
Overlap metal water stop joints a minimum of 150mm (6") and seal joints with two rows of structural sealant.
(E) Building Envelope Membrane Flashing
Must be compatible with and overlap the roof membrane flashing. Membrane gussets must be installed at all corners and transitions.
(F) Metal Cap Flashing
Adhere metal cap flashing to membrane flashing with a membrane compatible structural sealant. Mechanical attachment of metal flashing through the membrane flashing is not acceptable.
(G) Fenestration Assembly
CAUTION - Securement fasteners MUST NOT penetrate the metal or membrane flashing.
(H) Fenestration Assembly Securement Bar
Fasten securement bar ONLY through upper vertical leg of the window mullion (frame).

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.