TPO Roof System Details
TPO Roof System Details
Revision as of 20:14, 9 November 2016 by James Klassen (talk | contribs)
The drawings contained within this section are intended to represent a variety of thermoplastic roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult manufacturers’ specifications and RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and RGC.
For further information about thermoplastic (TPO and PVC) membrane system designs and requirements, see TPO/PVC (Thermoplastic Membranes) Roof Systems.
- D3.7.1-1 Assemblies (Insulated Conventional)
- D3.7.1-2 Assemblies (Ballasted Protected Membrane)
- D3.7.1-3 Assemblies (Fully Adhered)
- D3.7.2-1 Parapets & Copings (High - Wall Supported)(Under Construction)
- D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)(Under Construction)
- D3.7.3-1 Edges & Fascia (Cant Edge)(Under Construction)
- D3.7.3-2 Edges & Fascia (Gravel Stop)(Under Construction)
- D3.7.3-3 Edges & Fascia (Roof Edge)
- D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)(Under Construction)
- D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)(Under Construction)
- D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)(Under Construction)
- D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
- D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)(Under Construction)
- D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)(Under Construction)
- D3.7.4-7 Counter-flashings & Reglets (Window Curb)(Under Construction)
- D3.7.5-1 Roof-Wall Transitions (Expansion Joint)(Under Construction)
- D3.7.5-2 Roof-Wall Transitions (Divider/Joint)(Under Construction)
- D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)(Under Construction)
- D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)(Under Construction)
- D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)(Under Construction)
- D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)
- D3.7.6-3 Curbs & Sleepers (Basic Curb)
- D3.7.6-4 Curbs & Sleepers (Mechanical Opening)
- D3.7.7-1 Strip-in Flashings (Metal Plumbing)(Under Construction)
- D3.7.7-2 Strip-in Flashings (Two-part Cable)
- D3.7.7-3 Strip-in Flashings (Pourable Sealer Pocket)(Under Construction)
- D3.7.8-1 Water & Drainage (Cast Iron Drain)(Under Construction)
- D3.7.8-2 Water & Drainage (Spun Copper Drain)(Under Construction)
- D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)
- D3.7.8-4 Water & Drainage (Open Wall Scupper)(Under Construction)
- D3.7.8-5 Water & Drainage (Through-wall Scupper)(Under Construction)