EPDM Conventionally Insulated System (Alternate)

Jump to: navigation, search

EPDM Conventionally Insulated System (Alternate)

Revision as of 15:51, 21 September 2016 by James Klassen (talk | contribs)
RoofStar Guarantee Standards are blue-linked
EPDM Details

6.3.2.1.jpg

1 WORK INCLUDED

(1) Vapour Retarder
If required by design authority.
(2) Insulation
Mechanically attached where deck type permits. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
(3) Adhesive
Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
(4) Single-ply Membrane
Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
(5) Membrane Lap
Thermoset membrane may be joined using uncured tape or proprietary adhesive.
(6) Edge Flashing
Proprietary.
(7) Membrane Flashing
Installed according to manufacturer's instructions.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Fascia
Optional.
(C) Wood Blocking


NOTE: Refer to RoofStar Guarantee Standards for additional requirements.





Back to EPDM Application

Back to EPDM Construction Details

Back to Construction Details