SBS 2-Part Retrofit Flashing (Cable Penetration)

Jump to: navigation, search

SBS 2-Part Retrofit Flashing (Cable Penetration)

Revision as of 18:01, 30 January 2019 by James Klassen (talk | contribs) (WORK INCLUDED)
RoofStar Guarantee Standards are blue-linked
SBS Details

D1.7.7-2.jpg


Click below for a printable version of this page.
Technical Data Sheet


1 WORK INCLUDED

(1) Supporting Deck Overlay
Required when insulation is too thin to span flutes of steel decking or as thermal barrier when specified by the design authority.
(2) Air or Vapour Control Layers
If required by design authority.
(3) Insulation
Mechanically fastened where possible. See available insulation products in the Accepted Materials section of this Manual.
(4) Insulation Overlay
As required.
(5) Field Base Membrane
Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer's specification and to RoofStar Guarantee Standards. Torching directly to wood surfaces is not permitted.
(6) Mastic
Compatible with membrane
(7) Base Membrane Flashing
Adhered according to manufacturer's specifications, using cold adhesive, self-adhered or torch applied. Must be carried up flashing and terminate under hood flange. Torching directly to wood surfaces is not permitted.
(8) Field Cap Membrane
Applied according to manufacturer's printed instructions and to RoofStar Guarantee Standards.

2 RELATED WORK BY OTHERS

(A) Acceptable Supporting Deck Structure
(B) Wood Blocking
(C) Two-piece Flashing
Assembled around protrusion, laid in bed of compatible mastic on top of base sheet. Mechanically fasten two components together and fasten flange to wood blocking or deck.

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies

Back to SBS Modified Bitumen Construction Details

Back to Construction Details