Draft CD 12

Jump to: navigation, search

Draft CD 12

Revision as of 15:56, 7 October 2020 by James Klassen (talk | contribs) (WORK INCLUDED)
Notice to Reader
Images used in a Construction Detail are representative and not intended in their representation of an assembly to be prescriptive. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the Standards, Guiding Principles and Recommendations of the RoofStar Guarantee Standards for a Waterproofing or Water-shedding System. Actual design with respect to dimensions, the selection of materials and their application remains the responsibility of the Design Authority.

The full text of applicable RoofStar Guarantee Standards may be read by using the blue hyperlinks
ASM Details

ASM 11.1.1.jpg

Click below for a printable version of this page (N/A)
Print Sheet

1 WORK INCLUDED

(1) Underlayment
The type of underlay required is determined by roof slope.
(2) Insulation
Offset and stagger layers 300 mm (12").
(3) Vapour-permeable separation membrane
Installed over insulation and required on all insulated Architectural Sheet Metal Roof Systems. The material must be located between the insulation and metal panels/ventilation material (see 8.1.2 Design).
(4) Ventilation layer
Recommended over asphaltic underlays and / or as required in this Standard (see 8.1.2 Design).
(5) Architectural Metal Roof Panel
(6) Flange
Set in two continuous beads of acceptable sealant.
(7) Preformed Penetration Collar
(8) High-domed Gasketed Cladding-type Screws
Flange fastened to manufacturer's specifications.
(9) Stainless steel drawband
(10) Sealant
Apply an acceptable sealant between flashing and penetration. See 11.3.3 (5).
(11) Water-tight storm collar
Installed by other trade (new construction only) or as required in this Standard. See 11.3.3 (5).

2 RELATED WORK BY OTHERS

(A) Pipe penetration

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.


RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems

Back to ASM Construction Details