SBS Fire Separation Wall
SBS Fire Separation Wall
Revision as of 18:52, 27 June 2022 by James Klassen (talk | contribs)
Division D - Construction Details
SBS | Separation Wall ( Article 10.3.4.4.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
SBS Details
1 WORK INCLUDED
- (1) Primary Roof Membrane
- (2) Base Membrane Flashing
- (3) Non-combustible Insulation
- Optional (For condensation control) Cellular glass board insulation complying to ASTM C552-00 OR mineral fiber insulation conforming to CAN / CGSB 51.31-M84 and ASTM E84.
- (4) Base Metal Flashing
- S-Lock joints and concealed discontinuous clips required. Do not fasten to block firewall. (Optional – Metal base flashing may be installed on lower wall area.)
- (5) Water Channeling Clip
- (See inset) Concealed clip designed with ribs to channel water under standing seam joint with notch to allow water to escape, OR standing seam joints to be soldered, OR an additional layer of metal flashing with offsetting joints. Do NOT place combustible materials over top of firewall.
- (6) Metal Cap Flashing
- Standing seam joints and concealed continuous or discontinuous clips required.
2 RELATED WORK BY OTHERS
- (A) Acceptable Supporting Deck Structure
- (B) Cant
- (C) Acceptable Wall Surface - Plywood
- (D) Wood Frame Wall
- (E) Block or Concrete Firewall
- (F) Sloping Mortar
NOTE: See the Standard for additional requirements.
Back to "SBS" Roof System Details
© RCABC 2024
RoofStarTM is a registered Trademark of the RCABC.
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.