EPDM Conventionally Insulated System (Alternate)

Jump to: navigation, search

EPDM Conventionally Insulated System (Alternate)

Revision as of 17:50, 19 July 2016 by James Klassen (talk | contribs) (RELATED WORK BY OTHERS)

6.3.2.1.jpg


1 WORK INCLUDED

(1) Vapour Retardant: If required by design authority.

(2) Insulation: Mechanically attached where deck type permits. Installed according to RGC Guarantee Standard A4.3. See Section 2.2 for accepted materials

(3) Adhesive: Proprietary, installed according to manufacturer’s instructions, usually brushed, rolled or sprayed.

(4) Single Ply Membrane: Installed according to manufacturer’s instructions and RGC Guarantee Standards Section 2.1.1 and Section 2.1.3.

(5) Membrane Lap: Thermoplastic membrane may be welded or chemically bonded (See Section 6.2) Thermoset membrane may be joined using uncured tape or proprietary adhesive (See Section 6.1).

(6) Edge Flashing: Proprietary.

(7) Membrane Flashing: Installed according to manufacturer’s instructions.


2 RELATED WORK BY OTHERS

(A) Acceptable Deck

(B) Fascia: Optional.

(C) Wood Blocking: Equal to height of insulation.


NOTE: Refer to RGC Guarantee Standards for additional requirements.





Back to EPDM Application

Back to EPDM Construction Details

Back to Construction Details