Independent Observations

Jump to: navigation, search

Independent Observations

Revision as of 22:45, 14 February 2019 by James Klassen (talk | contribs) (James Klassen moved page Independent Inspections to Independent Observations)

Inspections required under the RoofStar Guarantee Program must be conducted by RoofStar-accepted Inspectors who are employed by an RoofStar-accepted inspection firm in British Columbia. The inspections required under the RoofStar Guarantee Program are as follows:


RoofStar 5-Year Roofing Guarantee

  • Inspections based on daily, whenever possible, during the actual roofing application, typically starting with a deck surface inspection
  • Inspections based on one inspection for every $25,000.00 during the actual roofing application, typically starting with a deck surface inspection
  • Final inspection upon completion
  • Written report by independent inspection company
  • Roof System Record including Guarantee Certificate & Roof Maintenance Guide
  • Re-inspection two years following completion
  • Written report presented to owner


RoofStar 10-Year Roofing Guarantee

  • Inspections based on daily, whenever possible, during the actual roofing application, typically starting with a deck surface inspection
  • Final inspection upon completion
  • Written report by independent inspection company
  • Roof System Record including Guarantee Certificate & Roof Maintenance Guide
  • Re-inspection two years following completion
  • Written report presented to owner
  • Five (5) year roof maintenance inspection
  • Eight (8) year roof maintenance inspection
  • Written reports presented to owner


RoofStar 5-Year Waterproofing Guarantee (Plaza, Promenade and Terraces)

  • Inspections based on daily, whenever possible, during the actual waterproofing membrane installation, typically starting with a deck surface inspection
  • Deck surface inspections which include moisture content report by the waterproofing applicator (contractor) on all concrete decks, performed daily prior to waterproofing installations
  • Membrane Moisture Survey report confirming watertight integrity of membrane prior to installation of any over burden (with the exception of adhered protection boards)
  • Final inspection upon completion
  • Written report by independent inspection company
  • Waterproofing System Record including Guarantee Certificate & Roof Maintenance Guide
  • Electronic Scan two years following completion


Requesting and Specifying a RoofStar Guarantee

Home