Draft CD 4

Jump to: navigation, search

Draft CD 4

Revision as of 23:10, 10 February 2020 by James Klassen (talk | contribs) (Created page with "{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span sty...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
RoofStar Guarantee Standards are blue-linked
Metal Flashing Details

10.2.1.jpg

END JOINTS in metal flashings are made using any one of the joints shown in this section, providing the following rules are complied with:

(1) Expansion: Allowances should be made for expansion and contraction. Soldered joints are not acceptable.

(2) Underlayment: Membrane under cap flashing. See, for example, SBS Roof Systems, 10.3 Application.

(3) Clips: Standing seams are fastened to wood blocking before applying the following length, using screws and clips.

(4) Fasteners: S-locks and Double S-locks are screwed through the single leaf before applying the following length. See SBS Roof Systems - 13. Perimeter Flashing: Metal.

(5) Metal Cap Flashing: Fastened with continuous concealed clips or cladding screws evenly spaced between seams. See SBS Roof Systems - 13. Perimeter Flashing: Metal.


Further detail on fastening of flashing is detailed in the SMACNA Manual referenced in the RoofStar Guarantee Standards sections of any of the Low Slope Membrane Roof Systems sections.

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.



Back to Metal Flashing Details

Back to Construction Details