Asphalt Shingles - Valley Intersection with Ridge
Asphalt Shingles - Valley Intersection with Ridge
RoofStar Guarantee Standards are blue-linked |
Asphalt Shingle Details
1 WORK INCLUDED
- (1) Valley Protection Membrane
- Applied beneath the metal valley flashing.
- (2) Valley Metal Flashing
- Required for open valleys.
- (3) Underlayment
- Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing. Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements.
- (4) Lower Membrane Patch
- Required to cover the joint where the ridgeline of one roof joins the sloped plane of another. Cut as illustrated and apply to the slope; the patch must be cut large enough to extend upslope at least 150 mm (6”), but must not exceed the exposure of the ridge cap shingles.
- (5) Upper Membrane Patch
- Required to overlap the Lower Membrane Patch, ‘shingle-style’, by at least 50 mm (2”). Extend the patch upslope past the Metal Valley Flashing at least 150 mm (6”).
- (6) Shingles (field)
- (7) Shingle Ridge Cap
- (8) Split Ridge Cap Shingle Transition
- Required to tie the ridge caps into the adjacent roof field shingles.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
RoofStar Guarantee Standards for Asphalt Shingle Systems