Asphalt Shingles - Diverter Flashing

Jump to: navigation, search

Asphalt Shingles - Diverter Flashing

Revision as of 22:05, 26 July 2021 by James Klassen (talk | contribs)

RoofStar Guarantee Standards are blue-linked
Asphalt Shingle Details
Click on any image to expand it
ASh 10.1.2-1 CD.jpg ASh 10.1.2-2 CD.jpg
ASh 10.1.2-3 CD.jpg ASh 10.1.2-4 CD.jpg

1 WORK INCLUDED

(1) Step 1
Use a standard 225 mm (9”) long step flashing and scribe the fold lines as shown on the illustration. Note that the down-slope upstand is bent at a 110-degree angle to the slope. No cutting is needed or appropriate; the flashing is formed with folds, bread-pan style.
(2) Step 2
Fold the bottom end of the flashing as illustrated, so that the bottom upstand aligns with the vertical bread-pan fold made in the next step.
(3) Step 3
Fold the back flap around and behind the main upstand, bread-pan style.
(4) Step 4
If required or desirable, cut a capillary notch in the bottom upstand (illustrated), and trim the upstand to suit the aesthetics of the roof.

2 RELATED WORK BY OTHERS

None

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.



Standard for Asphalt Shingle Systems

Back to Asphalt Shingles Construction Details

Back to Construction Details