SBS Structural Planter
SBS Structural Planter
Revision as of 00:00, 24 December 2015 by James Klassen (talk | contribs) (Created page with "<hr> File:D1.7.8.jpg File:D1.7.8a.jpg === WORK INCLUDED === ;(1) Primer: :Application method and coverage rate as approved by Primary Membrane Manufacturer. ;(2)...")
1 WORK INCLUDED
- (1) Primer
- Application method and coverage rate as approved by Primary Membrane Manufacturer.
- (2) Primary Roof Membrane
- Modified Bituminous base and cap sheet membranes installed as per manufacturer’s published application specifications.
- (3) Pre-Curb (Start-Up Curb) Membrane Flashing
- Modified Bituminous base and cap sheet membrane flashing installed as per manufacturer’s published application specifications.
- (4) Proprietary liquid membrane flashing System
- RGC accepted Liquid Membrane Flashing System(s) (Refer to RPM Section2.2, Section 5.2) or hot melt SBS modified bitumen. Install as per the Manufacturer’s published instructions.
- (5) Inside
- Planter Wall Membrane Flashing: Adhered according to manufacturer’s specifications using cold adhesive, self- adhered or torch applied membrane. Torching directly to wood surfaces is not permitted. Carry membrane flashing plies to reglet termination near top of planter wall (stagger membrane seal minimum 300mm (6”).
- (6) Reglet
- Metal Counter Flashing: As required by RGC Guarantee Standards. (See RGC Guarantee Standard A6.9)
- (7) Plaza Deck Assembly
- Extruded polystyrene insulation and filter mat over primary roof membranes. Concrete pavers placed above pre-curb membrane flashing height, on proprietary pedestals. Note: membrane flashing is not permitted above pre-curb membrane flashing on plaza deck side of planter walls.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- Concrete slab shown. Each planter area must have a drain through the roof deck.
- (B) Pre- Curb
- Minimum of 100mm (4”) in height above concrete deck, smooth dry and clean.
- (C) Cast over Concrete Planter Wall
- Form on top of membrane sealed Pre-curbs or Start-up curbs.
- (D) Re-Bar
- Placed a centre of Pre-curb.
- (E) Reglet
- Premanufactured purpose-made reglet cast in concrete wall or saw-cut.
- (F) Alternate Termination
- Horizontal Reglet alternative to premanufactured purpose-made reglet cast in concrete wall or saw-cut on vertical surface of inside planter walls.
NOTE: Refer to RGC Guarantee Standards for additional requirements.