PVC Conventionally Insulated System (Alternate)
PVC Conventionally Insulated System (Alternate)
Revision as of 22:16, 27 June 2022 by James Klassen (talk | contribs)
Division D - Construction Details
PVC | Conventionally Insulated System (Alternate) ( Article 1.1.3.1.)
Notice to Reader | |
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).
The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text. |
PVC Details
1 WORK INCLUDED
- (1) Vapour Retarder
- If required by design authority.
- (2) Insulation
- Mechanically fastened where deck type permits, or fully adhered (as illustrated). Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
- (3) Adhesive
- Proprietary, installed according to manufacturer’s instructions, usually brushed, rolled or sprayed (3A: 2- part low rising insulation adhesive, specifically used to bond insulation and cover boards)
- (4) Single-ply Membrane
- Installed according to manufacturer’s instructions and RoofStar Guarantee Standards.
- (5) Membrane Lap
- Thermoplastic membrane may be welded or chemically bonded.
- (6) Edge Flashing
- Proprietary, coated with membrane material and heat-welded to the primary (field) membrane.
- (7) Fascia Flashing Clip
- Affixed to the fascia material (installed by others) with fasteners O.C. 300 mm (12”).
- (8) Fascia Flashing
- Manufactured to RoofStar Guarantee Standards for sheet metal flashings.
- (9) Membrane Flashing
- Adhered according to manufacturer’s printed specifications using proprietary adhesive. Must be carried to the outside of the parapet or vertically to a minimum of 200 mm (8”) above the finished roof surface. Welded or adhered to primary membrane depending on membrane type.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Acceptable Parapet Surface
- Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer.
- (C) Edge Blocking
- (D) Fascia Material
NOTE: See the Standard for additional requirements.