SBS Metal Edge Termination

Jump to: navigation, search

SBS Metal Edge Termination

Revision as of 15:48, 19 July 2016 by James Klassen (talk | contribs) (Created page with "File:10.3.2.2.jpg === WORK INCLUDED === (1) <b>Vapor Retarder: </b>If required by design authority (2) <b>Insulation:</b> See list of accepted materials in Section 2.2...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

10.3.2.2.jpg

1 WORK INCLUDED

(1) Vapor Retarder: If required by design authority

(2) Insulation: See list of accepted materials in Section 2.2.

(3) Insulation Overlay: Where required. See RGC Guarantee Standard B4.1, B4.2 and C4.1

(4) Primary Membrane and Membrane Protection: Mechanically fasten to outside face of fascia (C).

(5) Mastic: Trowel coating of compatible mastic.

(6) Metal Edge/Gravel-stop Flashing: Minimum 100 mm (4") flange onto roof membrane, eave stop maximum 25 mm (1") high: embed in mastic and mechanically fasten alternately between centre and edge of flange at 100 mm (4") o/c; lap flashing 100 mm (4") minimum.

(7) Membrane Flashing: Asphalt and gravel roofing systems, 2 overlapping plies of a minimum 2 mm reinforced SBS modified bitumen base sheet or minimum 180 g / m² polyester felt. For flexible membrane systems, refer to manufacturer’s application details and RGC Guarantee Standards.

(8) Asphalt: For asphalt and gravel built-up roofing systems only.

(9) Gravel: For asphalt and gravel built-up roofing systems only.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

(B) Wood Blocking

(C) Wood Fascia

NOTE: Refer to RGC Guarantee Standards for additional requirements.





Back to SBS Application

Back to SBS Construction Details

Back to Construction Details