1 WORK INCLUDED
- (1) Conventional Roof Assembly
- (2) Metal Counter-flashing
- (3) Insulation
- See available insulation products in the Accepted Materials section of this Manual.
- (4) Primary Membrane and Membrane Flashing.
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Wall Anchor
- to CSA Z91-M90; Concrete slab shown, see anchor manufacturer’s attachment for other wall types and attachment methods
- (C) Anchor Eye
- to CSA Z91-M90
- (D) Anchor Placement
- Minimum 200 mm (8") above finished roof surface.
- (E) Plywood
- 15.9 mm (5/8") treated where required.