EPDM Roof System Details
EPDM Roof System Details
Revision as of 18:41, 8 August 2016 by James Klassen (talk | contribs)
The drawings contained within this section are intended to represent a variety of thermoset membrane roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult manufacturers’ specifications and RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and RGC.
For further information about thermoset membrane (EPDM) system designs and requirements, see EPDM (Thermoset Membranes) Roof Systems.
- D2.7.1 Assemblies (Insulated Conventional)
- D2.7.2 Assemblies (Fully Adhered)
- D2.7.3 Assemblies (Ballasted Protected Membrane)
- D2.7.20 Curbs & Sleepers (Basic Curb)
- D2.7.21 Curbs & Sleepers (Mechanical Opening)
- D2.7.24 Strip-in Flashings (Two-part Cable)
- D2.7.28 Water & Drainage (Clamping Spun Copper Drain)
- NOTE: The following pages are currently under construction
- D2.7.4 Parapets & Copings (High - Wall Supported)(Under Construction)
- D2.7.5 Parapets & Copings (Parapet - Wall Transition)(Under Construction)
- D2.7.6 Edges & Fascia (Cant Edge)(Under Construction)
- D2.7.7 Edges & Fascia (Gravel Stop)(Under Construction)
- D2.7.8 Counter-flashings & Reglets (Deck - Wall Supported)(Under Construction)
- D2.7.9 Counter-flashings & Reglets (Deck - Unsupported by Wall)(Under Construction)
- D2.7.10 Counter-flashings & Reglets (Stucco Wall: Re-roofing)(Under Construction)
- D2.7.11 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
- D2.7.12 Counter-flashings & Reglets (Double Surface Reglet)(Under Construction)
- D2.7.13 Counter-flashings & Reglets (Low Door Sill)(Under Construction)
- D2.7.14 Counter-flashings & Reglets (Window Curb)(Under Construction)
- D2.7.15 Roof-Wall Transitions (Expansion Joint)(Under Construction)
- D2.7.16 Roof-Wall Transitions (Divider/Joint)(Under Construction)
- D2.7.17 Roof-Wall Transitions (Fire Separation Joint)(Under Construction)
- D2.7.18 Roof-Wall Transitions (Fire Separation Wall)(Under Construction)
- D2.7.19 Curbs & Sleepers (Equipment Sleeper)(Under Construction)
- D2.7.20 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)
- D2.7.22 Curbs & Sleepers (Pre-curb for Planters)(Under Construction)
- D2.7.23 Strip-in Flashings (Metal Plumbing)(Under Construction)
- D2.7.25 Strip-in Flashings (Pourable Sealer Pocket)(Under Construction)
- D2.7.26 Water & Drainage (Cast Iron Drain)(Under Construction)
- D2.7.27 Water & Drainage (Spun Copper Drain)(Under Construction)
- D2.7.29 Water & Drainage (Open Wall Scupper)(Under Construction)
- D2.7.30 Water & Drainage (Through-wall Scupper)(Under Construction)
- D2.7.31 Miscellaneous Penetrations (Roof Anchor)(Under Construction)
- D2.7.32 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)(Under Construction)
- D2.7.33 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)(Under Construction)