EPDM Details:D2.7.8-5 Water & Drainage (Through-wall Scupper)
EPDM Details:D2.7.8-5 Water & Drainage (Through-wall Scupper)
Revision as of 18:47, 8 August 2016 by James Klassen (talk | contribs) (James Klassen moved page EPDM Details:D2.7.30 Water & Drainage (Through-wall Scupper) to EPDM Details:D2.7.31 Water & Drainage (Through-wall Scupper): numbering change)
NOTE: This page is under construction. Refer to the SBS Membrane Construction Details for similar application illustrations and requirements.