SBS Fall Protection Anchor in Wall

Jump to: navigation, search

SBS Fall Protection Anchor in Wall

Revision as of 21:18, 25 August 2016 by James Klassen (talk | contribs)
To read RoofStar Guarantee Standards for any element in this illustration, click on the blue-linked terms
SBS Details

10.3.7.2.jpg

1 WORK INCLUDED

(1) Conventional Roof Assembly
(2) Metal Counter-flashing
(3) Insulation
See available insulation products in the Accepted Materials section of this Manual.
(4) Primary Membrane and Membrane Flashing.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Wall Anchor
to CSA Z91-M90; Concrete slab shown, see anchor manufacturer’s attachment for other wall types and attachment methods
(C) Anchor Eye 
to CSA Z91-M90
(D) Anchor Placement
Minimum 200 mm (8") above finished roof surface.
(E) Plywood
15.9 mm (5/8") treated where required.

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.




Back to SBS Application

Back to SBS Construction Details

Back to Construction Details