TPO Roof System Details
TPO Roof System Details
Revision as of 15:11, 19 September 2016 by James Klassen (talk | contribs)
The drawings contained within this section are intended to represent a variety of thermoplastic roof system applications while remaining generic with regards to manufacturers’ specific application specifications. They do not represent all possible manufacturer application roof system designs. Consult manufacturers’ specifications and RoofStar Guarantee Standards to develop a system acceptable to both the manufacturer and RGC.
For further information about thermoplastic (TPO and PVC) membrane system designs and requirements, see TPO/PVC (Thermoplastic Membranes) Roof Systems.
- D3.7.1 Assemblies (Insulated Conventional)
- D3.7.1-1 Assemblies (Insulated Conventional)
- D3.7.3 Assemblies (Ballasted Protected Membrane)
- D3.7.1-2 Assemblies (Ballasted Protected Membrane)
- D3.7.2 Assemblies (Fully Adhered)
- D3.7.1-3 Assemblies (Fully Adhered)
- D3.7.4 Parapets & Copings (High - Wall Supported)(Under Construction)
- D3.7.2-1 Parapets & Copings (High - Wall Supported)(Under Construction)
- D3.7.5 Parapets & Copings (Parapet - Wall Transition)(Under Construction)
- D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)(Under Construction)
- D3.7.6 Edges & Fascia (Cant Edge)(Under Construction)
- D3.7.3-1 Edges & Fascia (Cant Edge)(Under Construction)
- D3.7.7 Edges & Fascia (Gravel Stop)(Under Construction)
- D3.7.3-2 Edges & Fascia (Gravel Stop)(Under Construction)
- D3.7.8 Edges & Fascia (Roof Edge)
- D3.7.3-3 Edges & Fascia (Roof Edge)
- D3.7.9 Counter-flashings & Reglets (Deck - Wall Supported)(Under Construction)
- D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)(Under Construction)
- D3.7.10 Counter-flashings & Reglets (Deck - Unsupported by Wall)(Under Construction)
- D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)(Under Construction)
- D3.7.11 Counter-flashings & Reglets (Stucco Wall: Re-roofing)(Under Construction)
- D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)(Under Construction)
- D3.7.12 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
- D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
- D3.7.13 Counter-flashings & Reglets (Double Surface Reglet)(Under Construction)
- D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)(Under Construction)
- D3.7.14 Counter-flashings & Reglets (Low Door Sill)(Under Construction)
- D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)(Under Construction)
- D3.7.15 Counter-flashings & Reglets (Window Curb)(Under Construction)
- D3.7.4-7 Counter-flashings & Reglets (Window Curb)(Under Construction)
- D3.7.16 Roof-Wall Transitions (Expansion Joint)(Under Construction)
- D3.7.5-1 Roof-Wall Transitions (Expansion Joint)(Under Construction)
- D3.7.17 Roof-Wall Transitions (Divider/Joint)(Under Construction)
- D3.7.5-2 Roof-Wall Transitions (Divider/Joint)(Under Construction)
- D3.7.18 Roof-Wall Transitions (Fire Separation Joint)(Under Construction)
- D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)(Under Construction)
- D3.7.19 Roof-Wall Transitions (Fire Separation Wall)(Under Construction)
- D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)(Under Construction)
- D3.7.20 Curbs & Sleepers (Equipment Sleeper)(Under Construction)
- D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)(Under Construction)
- D3.7.21 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)
- D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)
- D3.7.22 Curbs & Sleepers (Basic Curb)
- D3.7.6-3 Curbs & Sleepers (Basic Curb)
- D3.7.23 Curbs & Sleepers (Mechanical Opening)
- D3.7.6-4 Curbs & Sleepers (Mechanical Opening)
- D3.7.24 Curbs & Sleepers (Pre-curb for Planters)(Under Construction)
- D3.7.6-5 Curbs & Sleepers (Pre-curb for Planters)(Under Construction)
- D3.7.25 Strip-in Flashings (Metal Plumbing)(Under Construction)
- D3.7.7-1 Strip-in Flashings (Metal Plumbing)(Under Construction)
- D3.7.26 Strip-in Flashings (Two-part Cable)
- D3.7.7-2 Strip-in Flashings (Two-part Cable)
- D3.7.27 Strip-in Flashings (Pourable Sealer Pocket)(Under Construction)
- D3.7.7-3 Strip-in Flashings (Pourable Sealer Pocket)(Under Construction)
- D3.7.28 Water & Drainage (Cast Iron Drain)(Under Construction)
- D3.7.8-1 Water & Drainage (Cast Iron Drain)(Under Construction)
- D3.7.29 Water & Drainage (Spun Copper Drain)(Under Construction)
- D3.7.8-2 Water & Drainage (Spun Copper Drain)(Under Construction)
- D3.7.30 Water & Drainage (Clamping Spun Copper Drain)
- D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)
- D3.7.31 Water & Drainage (Open Wall Scupper)(Under Construction)
- D3.7.8-4 Water & Drainage (Open Wall Scupper)(Under Construction)
- D3.7.32 Water & Drainage (Through-wall Scupper)(Under Construction)
- D3.7.8-5 Water & Drainage (Through-wall Scupper)(Under Construction)
- D3.7.33 Miscellaneous Penetrations (Roof Anchor)(Under Construction)
- D3.7.9-1 Miscellaneous Penetrations (Roof Anchor)(Under Construction)
- D3.7.34 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)(Under Construction)
- D3.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)(Under Construction)
- D3.7.35 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)(Under Construction)
- D3.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)(Under Construction)