TPO Details:D3.7.8-5 Water & Drainage (Through-wall Scupper)
TPO Details:D3.7.8-5 Water & Drainage (Through-wall Scupper)
Revision as of 16:37, 21 September 2016 by James Klassen (talk | contribs)
RoofStar Guarantee Standards are blue-linked |
TPO/PVC Details
NOTE: This page is under construction. Refer to the SBS Membrane Construction Details for similar application illustrations and requirements.