(Created page with "File:8.1.4.15.1.jpg === WORK INCLUDED === (1) <b>Underlayment</b>: The type of underlay required is determined by roof slope (see Section 8.1.4.1 and Section 8.1.4.2)....")
 
Line 1: Line 1:
 +
<hr>
 
[[File:8.1.4.15.1.jpg]]
 
[[File:8.1.4.15.1.jpg]]
  
Line 39: Line 40:
  
  
 +
 +
[[Section:E. Application: Steep Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''ASM Application'']]
 +
 +
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''ASM Construction Details'']]
  
 
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
 
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]

Revision as of 22:48, 21 December 2015


8.1.4.15.1.jpg


1 WORK INCLUDED

(1) Underlayment: The type of underlay required is determined by roof slope (see Section 8.1.4.1 and Section 8.1.4.2).

(2) Slip Sheet: Recommended over asphaltic underlays and / or as required by metal roof panel manufacturer.

(3) Architectural Metal Roof Panel: Turned up (bread panned) at termination.

(4) Metal Roof Panel Clip: installed to metal roof manufacturer’s printed instructions

(5) ‘Z’ Closure: set in accepted caulking and secured with compatible, non-corrosive flat head fasteners.

(6) Manufactured plastic louvres:

(7) Exposed Fastener: High domed, gasketed cladding type screw compatible with metal roof panel (see Section 8.1.4.1 and 8.1.4.2).

(8) Metal Base Flashing: Must extend 200 mm (8") over metal roof panel. Lap joints must be sealed with two rows of accepted caulking. Exposed edges to be turned under.


2 RELATED WORK BY OTHERS

(A) Acceptable Deck

(B) Wood Nailer

(C) Free Vent Area

(D) Wall

(E) Building Paper

NOTE: * Refer to RGC Guarantee Standards for additional requirements.