Difference between revisions of "Asphalt Shingles - Changes in Slope (Outside Angle)"

Jump to: navigation, search

Difference between revisions of "Asphalt Shingles - Changes in Slope (Outside Angle)"

 
(11 intermediate revisions by the same user not shown)
Line 1: Line 1:
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
+
{{Template:RPM Info}}
| colspan="2| <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big>
+
 
|}
+
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
 +
 
 +
<big><big>Division D - Construction Details</big></big>
 +
<hr>
 +
<big><big><big><big><big>Asphalt Shingles | Changes in Slope (Outside Angle) ([[Asphalt_Shingle_Systems_Standard#9.3.2.7. Changes in Slope | Article 9.3.2.7.]])</big></big></big></big></big>
 +
{{Template:Construction Details Header}}
 
<div class="panel panel-success">
 
<div class="panel panel-success">
 
<div class="panel-heading"><big>'''Asphalt Shingle Details'''</big></div>
 
<div class="panel-heading"><big>'''Asphalt Shingle Details'''</big></div>
Line 8: Line 14:
 
<div style="text-align:center; vertical-align:center">
 
<div style="text-align:center; vertical-align:center">
  
[[File:ASh 9.1.4 CD.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/2/2c/ASh_9.1.4_CD.jpg]]
+
[[File:ASh Slope Change - Outside Angle.jpg|class=img-responsive | link=http://rpm.rcabc.org/images/2/2c/ASh_9.1.4_CD.jpg]]
 
</div>
 
</div>
 
</div><!-- COL-MD-6 -->
 
</div><!-- COL-MD-6 -->
Line 14: Line 20:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShUNDERLAYMENT|'''Underlayment''']]: Underlayment on the upper slope must overlap the metal transition flashing and lower slope underlayment.
+
;(1) [[Asphalt Shingle Systems Standard#AShUNDERLAYMENT|'''Underlayment''']]: Underlayment on the upper slope must overlap the metal transition flashing and lower slope underlayment.
;(2) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShEAVES|'''Self-adhered (eave protection) Membrane''']]: Optional for this slope change configuration, to seal the upper edge of the metal transition flashing.  When installed, the SA membrane must overlap the metal by at least 50 mm (2”) and extend upslope past the edge of the lower slope underlayment by at least 50 mm (2”).
+
;(2) [[Asphalt Shingle Systems Standard#AShEAVES|'''Self-adhered (eave protection) Membrane''']]: Optional for this slope change configuration, to seal the upper edge of the metal transition flashing.  When installed, the SA membrane must overlap the metal by at least 50 mm (2”) and extend upslope past the edge of the lower slope underlayment by at least 50 mm (2”).
;(3) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShTRANSITIONS|'''Metal Transition Flashing''']]: The lower leg must measure at least 100 mm (4”); the upper leg should measure at least 125 mm (5”).
+
;(3) [[Asphalt Shingle Systems Standard#AShTRANSITIONS|'''Metal Transition Flashing''']]: The lower leg must measure at least 100 mm (4”); the upper leg should measure at least 125 mm (5”).
;(4) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShFIELDAPPLICATION|'''Starter Shingle''']]:  
+
;(4) [[Asphalt Shingle Systems Standard#AShPART9GEN-APPLICATION|'''Starter Shingle''']]:  
;(5) [[RoofStar Guarantee Standards for Asphalt Shingle Systems#AShFIELDAPPLICATION|'''Shingle''']]:  
+
;(5) [[Asphalt Shingle Systems Standard#AShPART9GEN-APPLICATION|'''Shingle''']]:  
  
 
<hr>
 
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[RoofStar Guarantee Standards for Asphalt Shingles Roof Assemblies#ASDECK|'''Acceptable Deck''']]
+
;(A) [[Asphalt Shingle Systems Standard#AShDECKS|'''Acceptable Deck''']]
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL -->
 
</div><!-- PANEL -->
  
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
+
'''NOTE''': See the [[Asphalt Shingle Systems Standard | '''Standard''']] for additional requirements.
  
 
<hr>
 
<hr>
  
 +
[[Asphalt Shingle System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingle System Details'']]
  
[[RoofStar Guarantee Standards for Asphalt Shingle Systems|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for Asphalt Shingle Systems]]
+
[[Main Page | <i class="fa fa-home fa"></i> Home]]
 
 
[[Asphalt Shingle Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingles Construction Details'']]
 
  
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Latest revision as of 14:01, 28 September 2022



Division D - Construction Details


Asphalt Shingles | Changes in Slope (Outside Angle) ( Article 9.3.2.7.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

Asphalt Shingle Details

ASh Slope Change - Outside Angle.jpg

1 WORK INCLUDED

(1) Underlayment
Underlayment on the upper slope must overlap the metal transition flashing and lower slope underlayment.
(2) Self-adhered (eave protection) Membrane
Optional for this slope change configuration, to seal the upper edge of the metal transition flashing. When installed, the SA membrane must overlap the metal by at least 50 mm (2”) and extend upslope past the edge of the lower slope underlayment by at least 50 mm (2”).
(3) Metal Transition Flashing
The lower leg must measure at least 100 mm (4”); the upper leg should measure at least 125 mm (5”).
(4) Starter Shingle
(5) Shingle

2 RELATED WORK BY OTHERS

(A) Acceptable Deck

NOTE: See the Standard for additional requirements.


Back to Asphalt Shingle System Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.