Difference between revisions of "Asphalt Shingles - Curb Flashing (Typical)"
Difference between revisions of "Asphalt Shingles - Curb Flashing (Typical)"
Line 13: | Line 13: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) '''Asphalt Shingles''': Installed to manufacturer’s published instructions and | + | ;(1) '''Asphalt Shingles''': Installed to manufacturer’s published instructions and '''''RoofStar Guarantee Standards'''''. |
− | ;(2) [[RoofStar Guarantee Standards for Asphalt Shingles Roof | + | ;(2) [[RoofStar Guarantee Standards for Asphalt Shingles Roof Assemblies#ASPROTRUSIONS|'''Apron Flashing''']] |
: Extended a minimum 100mm (4") beyond corners, interwoven with shingles and step flashings. | : Extended a minimum 100mm (4") beyond corners, interwoven with shingles and step flashings. | ||
− | ;(3) [[RoofStar Guarantee Standards for Asphalt Shingles Roof | + | ;(3) [[RoofStar Guarantee Standards for Asphalt Shingles Roof Assemblies#ASPROTRUSIONS|'''Step Flashing''']]: Interwoven with each course of shingles, 75mm (3") head lap. |
;(4) '''Final Step flashing''': Extended around corner of the upstand and under back pan flashing. The upstand fold can alternatively be turned outward under the back pan fold. | ;(4) '''Final Step flashing''': Extended around corner of the upstand and under back pan flashing. The upstand fold can alternatively be turned outward under the back pan fold. | ||
− | ;(5) [[RoofStar Guarantee Standards for Asphalt Shingles Roof | + | ;(5) [[RoofStar Guarantee Standards for Asphalt Shingles Roof Assemblies#ASPROTRUSIONS|'''Backpan Flashing''']]: The back-pan is to be extended 100mm (4") beyond the corner and folded. Apply caulking at the transition corner of the final step flashing and back pan. |
;(6) '''Capillary Section''': A capillary tab is to be extended off the end of the back pan to lead water around the corner. | ;(6) '''Capillary Section''': A capillary tab is to be extended off the end of the back pan to lead water around the corner. | ||
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
Line 25: | Line 25: | ||
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements. | '''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements. | ||
− | *Proprietary soldered or welded diverter flashing may be used provided they conform to ''RoofStar Guarantee Standards''. | + | *Proprietary soldered or welded diverter flashing may be used provided they conform to '''''RoofStar Guarantee Standards'''''. |
− | |||
<hr> | <hr> | ||
− | + | [[RoofStar Guarantee Standards for Asphalt Shingles Roof Assemblies|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for Asphalt Shingles Roof Assemblies]] | |
− | [[RoofStar Guarantee Standards for Asphalt Shingles Roof | ||
[[Asphalt Shingles Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingles Construction Details'']] | [[Asphalt Shingles Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingles Construction Details'']] | ||
− | [[ | + | [[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] |
Revision as of 17:59, 23 October 2017
RoofStar Guarantee Standards are blue-linked |
Asphalt Shingle Details
WORK INCLUDED
- (1) Asphalt Shingles
- Installed to manufacturer’s published instructions and RoofStar Guarantee Standards.
- (2) Apron Flashing
- Extended a minimum 100mm (4") beyond corners, interwoven with shingles and step flashings.
- (3) Step Flashing
- Interwoven with each course of shingles, 75mm (3") head lap.
- (4) Final Step flashing
- Extended around corner of the upstand and under back pan flashing. The upstand fold can alternatively be turned outward under the back pan fold.
- (5) Backpan Flashing
- The back-pan is to be extended 100mm (4") beyond the corner and folded. Apply caulking at the transition corner of the final step flashing and back pan.
- (6) Capillary Section
- A capillary tab is to be extended off the end of the back pan to lead water around the corner.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
- Proprietary soldered or welded diverter flashing may be used provided they conform to RoofStar Guarantee Standards.
RoofStar Guarantee Standards for Asphalt Shingles Roof Assemblies