Difference between revisions of "Asphalt Shingles - Intersection with Waterproofing Roof (Lower)"
Difference between revisions of "Asphalt Shingles - Intersection with Waterproofing Roof (Lower)"
Line 1: | Line 1: | ||
+ | {{Template:RPM Info}} | ||
+ | |||
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | {| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | ||
| colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big> | | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big> |
Revision as of 22:07, 26 July 2021
RoofStar Guarantee Standards are blue-linked |
Asphalt Shingle Details
1 WORK INCLUDED
- (1) Underlayment
- Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing. Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements.
- (2) Shingles (field)
- (3) Field Shingles
- Fasteners used to secure shingles must be at least 300 mm (12") above the finished surface of the roof waterproofing system.
- (4) Field Membrane
- Secure membrane to water-shedding roof deck at least 300 mm (12") above the finished surface of the roof waterproofing (refer to the related Membrane Standards, Part 9 FIELD MEMBRANE and Part 10 PERIMETERS and WALLS).
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
Standard for Asphalt Shingle Systems