Difference between revisions of "Asphalt Shingles - Intersection with Waterproofing Roof (Lower)"
Difference between revisions of "Asphalt Shingles - Intersection with Waterproofing Roof (Lower)"
Line 20: | Line 20: | ||
<div class="col-md-6"> | <div class="col-md-6"> | ||
=== WORK INCLUDED === | === WORK INCLUDED === | ||
− | ;(1) [[ | + | ;(1) [[Standard for Asphalt Shingle Systems#AShUNDERLAYMENT|'''Underlayment''']]: Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing. Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements. |
− | ;(2) [[ | + | ;(2) [[Standard for Asphalt Shingle Systems#AShPART9GEN-APPLICATION|'''Shingles (field)''']]: |
− | ;(3) [[ | + | ;(3) [[Standard for Asphalt Shingle Systems#AShPART9GEN-APPLICATION|'''Field Shingles''']]: Fasteners used to secure shingles must be at least 300 mm (12") above the finished surface of the ''roof waterproofing system''. |
− | ;(4) Field Membrane: Secure membrane to | + | ;(4) Field Membrane: Secure membrane to ''water-shedding roof deck'' at least 300 mm (12") above the finished surface of the ''roof waterproofing'' (refer to the related Membrane Standards, Part '''9 FIELD MEMBRANE''' and Part '''10 PERIMETERS and WALLS'''). |
<hr> | <hr> | ||
=== RELATED WORK BY OTHERS === | === RELATED WORK BY OTHERS === | ||
− | ;(A) [[ | + | ;(A) [[Standard for Asphalt Shingle Systems#AShDECK|'''Acceptable Deck''']] |
</div><!-- COL-6-MD --> | </div><!-- COL-6-MD --> | ||
</div><!-- PANEL BODY --> | </div><!-- PANEL BODY --> | ||
Line 38: | Line 38: | ||
− | [[ | + | [[Standard for Asphalt Shingle Systems|<i class="fa fa-chevron-circle-left fa" ></i> Standard for Asphalt Shingle Systems]] |
[[Asphalt Shingle Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingles Construction Details'']] | [[Asphalt Shingle Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Asphalt Shingles Construction Details'']] | ||
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] | [[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] |
Revision as of 16:54, 8 June 2021
RoofStar Guarantee Standards are blue-linked |
Asphalt Shingle Details
1 WORK INCLUDED
- (1) Underlayment
- Required, and installed to overlap the Valley Protection Membrane and the Valley Metal Flashing. Install ‘shingle-style’, following the requirements for side and end laps; use acceptable fasteners, or adhere (if a self-adhering membrane) in keeping with the manufacturer’s published requirements.
- (2) Shingles (field)
- (3) Field Shingles
- Fasteners used to secure shingles must be at least 300 mm (12") above the finished surface of the roof waterproofing system.
- (4) Field Membrane
- Secure membrane to water-shedding roof deck at least 300 mm (12") above the finished surface of the roof waterproofing (refer to the related Membrane Standards, Part 9 FIELD MEMBRANE and Part 10 PERIMETERS and WALLS).
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
Standard for Asphalt Shingle Systems