Construction Details (drafting page)

Jump to: navigation, search

Construction Details (drafting page)

This page is used for drafting new Construction Details, before publishing

1 EPDM

10 PERIMETERS and WALLS

D2.7.5-1 Roof-Wall Transitions (Expansion Joint)(Under Construction)
D2.7.5-2 Roof-Wall Transitions (Divider/Joint)(Under Construction)
D2.7.5-3 Roof-Wall Transitions (Fire Separation Joint)(Under Construction)
D2.7.5-4 Roof-Wall Transitions (Fire Separation Wall)(Under Construction)
D2.7.2-1 Parapets & Copings (High - Wall Supported)(Under Construction)
D2.7.2-2 Parapets & Copings (Parapet - Wall Transition)(Under Construction)
D2.7.3-1 Edges & Fascia (Cant Edge)(Under Construction)
D2.7.3-2 Edges & Fascia (Gravel Stop)(Under Construction)
D2.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)(Under Construction)
D2.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)(Under Construction)
D2.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)(Under Construction)
D2.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
D2.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)(Under Construction)
D2.7.4-6 Counter-flashings & Reglets (Low Door Sill)(Under Construction)
D2.7.4-7 Counter-flashings & Reglets (Window Curb)(Under Construction)

11 PERIMETERS and DRAINS

D2.7.6-1 Curbs & Sleepers (Equipment Sleeper)(Under Construction)
D2.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)
D2.7.6-3 Curbs & Sleepers (Basic Curb)
D2.7.6-4 Curbs & Sleepers (Mechanical Opening)
D2.7.7-1 Strip-in Flashings (Metal Plumbing)(Under Construction)
D2.7.7-2 Strip-in Flashings (Two-part Cable)
D2.7.7-3 Strip-in Flashings (Pourable Sealer Pocket)(Under Construction)
D2.7.8-1 Water & Drainage (Cast Iron Drain)(Under Construction)
D2.7.8-2 Water & Drainage (Spun Copper Drain)(Under Construction)
D2.7.8-3 Water & Drainage (Clamping Spun Copper Drain)
D2.7.8-4 Water & Drainage (Open Wall Scupper)(Under Construction)
D2.7.8-5 Water & Drainage (Through-wall Scupper)(Under Construction)
D2.7.9-1 Miscellaneous Penetrations (Roof Anchor)(Under Construction)
D2.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)(Under Construction)
D2.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)(Under Construction)

2 TPO

10 PERIMETERS and WALLS

D3.7.5-1 Roof-Wall Transitions (Expansion Joint)(Under Construction)
D3.7.5-2 Roof-Wall Transitions (Divider/Joint)(Under Construction)
D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)(Under Construction)
D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)(Under Construction)
D3.7.2-1 Parapets & Copings (High - Wall Supported)(Under Construction)
D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)(Under Construction)
D3.7.3-1 Edges & Fascia (Cant Edge)(Under Construction)
D3.7.3-2 Edges & Fascia (Gravel Stop)(Under Construction)
D3.7.3-3 Edges & Fascia (Roof Edge)
D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)(Under Construction)
D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)(Under Construction)
D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)(Under Construction)
D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)(Under Construction)
D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)(Under Construction)
D3.7.4-7 Counter-flashings & Reglets (Window Curb)(Under Construction)

11 PERIMETERS and DRAINS

D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)(Under Construction)
D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)
D3.7.6-3 Curbs & Sleepers (Basic Curb)
D3.7.6-4 Curbs & Sleepers (Mechanical Opening)
D3.7.7-1 Strip-in Flashings (Metal Plumbing)(Under Construction)
D3.7.7-2 Strip-in Flashings (Two-part Cable)
D3.7.7-3 Strip-in Flashings (Pourable Sealer Pocket)(Under Construction)
D3.7.8-1 Water & Drainage (Cast Iron Drain)(Under Construction)
D3.7.8-2 Water & Drainage (Spun Copper Drain)(Under Construction)
D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)
D3.7.8-4 Water & Drainage (Open Wall Scupper)(Under Construction)
D3.7.8-5 Water & Drainage (Through-wall Scupper)(Under Construction)
D3.7.9-1 Miscellaneous Penetrations (Roof Anchor)(Under Construction)
D3.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)(Under Construction)
D3.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)(Under Construction)

3 PVC

10 PERIMETERS and WALLS

D3.7.5-1 Roof-Wall Transitions (Expansion Joint)(Under Construction)
D3.7.5-2 Roof-Wall Transitions (Divider/Joint)(Under Construction)
D3.7.5-3 Roof-Wall Transitions (Fire Separation Joint)(Under Construction)
D3.7.5-4 Roof-Wall Transitions (Fire Separation Wall)(Under Construction)
D3.7.2-1 Parapets & Copings (High - Wall Supported)(Under Construction)
D3.7.2-2 Parapets & Copings (Parapet - Wall Transition)(Under Construction)
D3.7.3-1 Edges & Fascia (Cant Edge)(Under Construction)
D3.7.3-2 Edges & Fascia (Gravel Stop)(Under Construction)
D3.7.3-3 Edges & Fascia (Roof Edge)
D3.7.4-1 Counter-flashings & Reglets (Deck - Wall Supported)(Under Construction)
D3.7.4-2 Counter-flashings & Reglets (Deck - Unsupported by Wall)(Under Construction)
D3.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)(Under Construction)
D3.7.4-4 Counter-flashings & Reglets (Stucco Wall: New)(Under Construction)
D3.7.4-5 Counter-flashings & Reglets (Double Surface Reglet)(Under Construction)
D3.7.4-6 Counter-flashings & Reglets (Low Door Sill)(Under Construction)
D3.7.4-7 Counter-flashings & Reglets (Window Curb)(Under Construction)

11 PERIMETERS and DRAINS

D3.7.6-1 Curbs & Sleepers (Equipment Sleeper)(Under Construction)
D3.7.6-2 Curbs & Sleepers (Multiple Roof Penetrations)(Under Construction)
D3.7.6-3 Curbs & Sleepers (Basic Curb)
D3.7.6-4 Curbs & Sleepers (Mechanical Opening)
D3.7.7-1 Strip-in Flashings (Metal Plumbing)(Under Construction)
D3.7.7-2 Strip-in Flashings (Two-part Cable)
D3.7.7-3 Strip-in Flashings (Pourable Sealer Pocket)(Under Construction)
D3.7.8-1 Water & Drainage (Cast Iron Drain)(Under Construction)
D3.7.8-2 Water & Drainage (Spun Copper Drain)(Under Construction)
D3.7.8-3 Water & Drainage (Clamping Spun Copper Drain)
D3.7.8-4 Water & Drainage (Open Wall Scupper)(Under Construction)
D3.7.8-5 Water & Drainage (Through-wall Scupper)(Under Construction)
D3.7.9-1 Miscellaneous Penetrations (Roof Anchor)(Under Construction)
D3.7.9-2 Miscellaneous Penetrations (Wall Anchor - Conventional Roof Assy)(Under Construction)
D3.7.9-3 Miscellaneous Penetrations (Wall Anchor - Protected Roof Assy)(Under Construction)