Difference between revisions of "Draft CD 10"

Jump to: navigation, search

Difference between revisions of "Draft CD 10"

(Created page with "{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center" | colspan="2" | <big>'''''RoofStar Guarantee Standards''''' are <span sty...")
 
(WORK INCLUDED)
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
+
 
| colspan="2| <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big>
+
 
|}
+
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
 +
 
 +
<big><big>Division D - Construction Details</big></big>
 +
<hr>
 +
<big><big><big><big><big>PVC | Membrane Termination D (Wall) ([[PVC_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big>
 +
{{Template:Construction Details Header}}
 
<div class="panel panel-success">
 
<div class="panel panel-success">
<div class="panel-heading"><big>'''SBS Details'''</big></div>
+
<div class="panel-heading"><big>'''PVC Details'''</big></div>
 
<div class="panel-body">
 
<div class="panel-body">
 
<div class="col-md-6">
 
<div class="col-md-6">
 
<div style="text-align:center; vertical-align:center">
 
<div style="text-align:center; vertical-align:center">
[[File:D1.7.7-2.jpg|class=img-responsive]]
+
<br>
 +
[[File:10.3.2.3.-PVC-D.png|class=img-responsive | link=https://rpm.rcabc.org/images/3/3c/10.3.2.3.-PVC-D.png]]
 +
:Drawing NTS
 
</div>
 
</div>
 
+
</div><!-- COL-6-MD -->
 
 
 
 
::Click below for a printable version of this page.
 
 
 
<div style="width:150px; text-align: left;">
 
:[[File:Pdf.png|100 px|link=http://rpm.rcabc.org/images/6/60/D1.7.7-2_SBS_Details_-_Strip-in_Flashings_%282-Part_Cable_Flashing%29.pdf|'''Technical Data Sheet''']]
 
</div>
 
 
 
 
 
</div><!-- COL-MD-6 -->
 
  
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSSUBSTRATES|'''Supporting Deck Overlay''']]: Required when insulation is too thin to span flutes of steel decking or as thermal barrier when specified by the design authority.
 
;(2) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSAIRVAPOUR|'''Air or Vapour Control Layers''']]: If required by design authority.
 
;(3) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSINSULATION|'''Insulation''']]: Mechanically fastened where possible.  See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
 
;(4) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSINSULATIONOVERLAY|'''Insulation Overlay''']]: As required.
 
;(5) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSBASE|'''Field Base Membrane''']]: Adhered to overlay board using asphalt, cold adhesive, self-adhered, mechanical attachment or torch applied according to manufacturer's specification and to <i>RoofStar Guarantee Standards</i>. Torching directly to wood surfaces is not permitted.
 
;(6) '''Mastic''': Compatible with membrane
 
;(7) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBS-STRIPPING|'''Base Membrane Flashing''']]: Adhered according to manufacturer's specifications, using cold adhesive, self-adhered or torch applied. Must be carried up flashing and terminate under hood flange. Torching directly to wood surfaces is not permitted.
 
;(8) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSBASE|'''Field Cap Membrane''']]: Applied according to manufacturer's printed instructions and to <i>RoofStar Guarantee Standards</i>.
 
  
<hr>
+
;(1) [[PVC Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]:
 +
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.
 +
;(2) [[PVC Roof Systems Standard#PART_7|<big>Insulation</big>]]:
 +
:Installed in keeping with Section 7.3.  Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.
 +
;(3) [[PVC Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:
 +
:Required for fully adhered membrane systems or when overburden is specified.  Panels must be offset and staggered from underlying insulation panels.
 +
;(4) [[PVC Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:
 +
:See Table 9.2. for permissible application methods and corresponding membrane properties.  Membrane must be installed according to the requirements in Section 9.3.
 +
;(5) [[PVC Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:
 +
:Proprietary to the membrane manufacturer.  Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).
 +
;(6) [[PVC Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:
 +
:Edge securement must be anchored to the roof structure to prevent membrane movement.
 +
;(7) [[PVC Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:
 +
:Proprietary to the membrane manufacturer.  Primer may be required for self-adhered membranes; adhesive is required for all other applications.  All membranes applied to the vertical substrate must be fully adhered.
 +
;(8) [[PVC Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:
 +
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements).  Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.
 +
;(9) [[PVC Roof Systems Standard#PART_10|<big>Membrane Edge Securement and Sealant</big>]]:
 +
:All membranes applied to a vertical surface must be mechanically fastened.  Mechanically fastened termination (“term”) bar with tooled sealant shown.
 +
;(10) [[PVC Roof Systems Standard#PART_10|<big>Cut Reglet Counter-flashing and Sealant</big>]]:
 +
:Cut reglet counter-flashing with bead of sealant applied in reglet cut.  This flashing provides secondary protection for the “term” bar and safe-guards the sealant from weather-induced deterioration and mechanical damage.
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSDECKS|'''Acceptable Supporting Deck Structure''']]
+
;(A) [[PVC Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]
;(B) '''Wood Blocking'''
+
:Illustrated deck is representative.  See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.
;(C) [[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies#SBSSTRIPFLASH|'''Two-piece Flashing''']]: Assembled around protrusion, laid in bed of compatible mastic on top of base sheet. Mechanically fasten two components together and fasten flange to wood blocking or deck.
+
;(B) [[PVC Roof Systems Standard#PART_2|<big>Wall Structure</big>]]
 +
:Illustrated wall is representative.  Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''. See Sub-section 2.1.7. for wall conditions.
 +
 
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL -->
 
</div><!-- PANEL -->
  
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
+
'''NOTE''': See the [[PVC Roof Systems Standard | '''PVC Roof Systems Standard''']] for additional requirements.
 
 
  
 
<hr>
 
<hr>
  
 +
[[PVC Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''PVC Roof System Details'']]
  
[[RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies |<i class="fa fa-chevron-circle-left fa" ></i> Back to ''RoofStar Guarantee Standards for SBS Modified Bitumen Roof Assemblies'']]
+
[[Main Page | <i class="fa fa-home fa"></i> Home]]
 
 
[[SBS Modified Bitumen Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''SBS Modified Bitumen Construction Details'']]
 
  
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
+
{{Template:RPM Page Footer with Copyright and Current Date}}

Latest revision as of 15:31, 16 February 2024



Division D - Construction Details


PVC | Membrane Termination D (Wall) ( Article 10.3.2.3.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

PVC Details


10.3.2.3.-PVC-D.png

Drawing NTS

1 WORK INCLUDED

(1) Air/Vapour Control Layers
As specified by the Design Authority and installed to provide continuity for optimal control.
(2) Insulation
Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.
(3) Insulation Overlay Panel
Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.
(4) Field Membrane
See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.
(5) Edge Securement
Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).
(6) Mechanical Fastening
Edge securement must be anchored to the roof structure to prevent membrane movement.
(7) Primer or Adhesive
Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.
(8) Membrane Flashing
May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the finished roof system surface, plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.
(9) Membrane Edge Securement and Sealant
All membranes applied to a vertical surface must be mechanically fastened. Mechanically fastened termination (“term”) bar with tooled sealant shown.
(10) Cut Reglet Counter-flashing and Sealant
Cut reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the “term” bar and safe-guards the sealant from weather-induced deterioration and mechanical damage.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
Illustrated deck is representative. See Sub-section 2.1.5. for acceptable deck types and conditions.
(B) Wall Structure
Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap roofing system to achieve continuity. See Sub-section 2.1.7. for wall conditions.

NOTE: See the PVC Roof Systems Standard for additional requirements.


Back to PVC Roof System Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.