Difference between revisions of "Draft CD 12"

Jump to: navigation, search

Difference between revisions of "Draft CD 12"

(WORK INCLUDED)
 
Line 1: Line 1:
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
+
 
| colspan="2"  | <big>'''''Notice to Reader'''''</big>
+
 
|-
+
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
| style="color: black; background-color: #ffffcc; width: 100%;text-align:center" | Images used in a Construction Detail are representative and <u>not intended in their representation of an assembly to be prescriptive</u>. Nor are they necessarily drawn to scale. Rather, they are provided to visually convey the Standards, Guiding Principles and Recommendations of the '''RoofStar Guarantee Standards''' for a Waterproofing or Water-shedding System. Actual design with respect to dimensions, the selection of materials and their application remains the responsibility of the ''Design Authority''.<br><br>The full text of applicable '''''RoofStar Guarantee Standards''''' may be read by using the <span style="color:#6495ed">'''blue hyperlinks'''</span>
+
__NOTOC__
|}
+
 
 +
<big><big>Division D - Construction Details</big></big>
 +
<hr>
 +
<big><big><big><big><big>PVC | Membrane Termination F (Wall) ([[PVC_Roof_Systems_Standard#10.3.2.3._General_Application_Requirements_for_Perimeters_and_Walls | Article 10.3.2.3.]])</big></big></big></big></big>
 +
{{Template:Construction Details Header}}
 
<div class="panel panel-success">
 
<div class="panel panel-success">
<div class="panel-heading"><big>'''ASM Details'''</big></div>
+
<div class="panel-heading"><big>'''PVC Details'''</big></div>
 
<div class="panel-body">
 
<div class="panel-body">
 
<div class="col-md-6">
 
<div class="col-md-6">
 
<div style="text-align:center; vertical-align:center">
 
<div style="text-align:center; vertical-align:center">
[[File:8.1.4.8.1.jpg|class=img-responsive]]
+
<br>
 +
[[File:10.3.2.3.-PVC-F.png|class=img-responsive | link=https://rpm.rcabc.org/images/b/b9/10.3.2.3.-PVC-F.png]]
 +
:Drawing NTS
 
</div>
 
</div>
::Click below for a printable version of this page (N/A)
+
</div><!-- COL-6-MD -->
 
 
<div style="width:150px; text-align: left;">
 
:[[File:Pdf.png|100 px|link=http://rpm.rcabc.org/images/5/52/D1.7.6-3_Print_Sheet.pdf|'''Print Sheet''']]
 
</div>
 
</div><!-- COL-MD-6 -->
 
  
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMUNDERLAYMENT|'''Underlayment''']]: The type of underlay required is determined by roof slope.
 
;(2) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMINSULALIGNMENT|'''Insulation''']]: Offset and stagger layers 300 mm (12").
 
;(3) [[RoofStar Guarantee Standards for ASM Roof Assemblies#ASMSEP-VENT|'''Vapour-permeable separation membrane''']]: Installed over insulation and required on all insulated Architectural Sheet Metal Roof Systems.  The material must be located between the insulation and metal panels/ventilation material (see [http://rpm.rcabc.org/index.php?title=RoofStar_Guarantee_Standards_for_Architectural_Sheet_Metal_(ASM)_Systems#Design_5 '''8.1.2 Design''']).
 
;(4) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMSLIP|'''Ventilation layer''']]: Recommended over asphaltic underlays and / or as required in this Standard (see [http://rpm.rcabc.org/index.php?title=RoofStar_Guarantee_Standards_for_Architectural_Sheet_Metal_(ASM)_Systems#Design_5 '''8.1.2 Design''']).
 
;(5) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMPANEL |'''Architectural Metal Roof Panel''']]: Clips not illustrated.
 
;(6) '''Flange''':  Set in two continuous beads of acceptable sealant.
 
;(7) '''Preformed Penetration Collar'''
 
;(8) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMCLADSCREW |'''High-domed Gasketed Cladding-type Screws''']]: Flange fastened to manufacturer's specifications.
 
;(9) '''Stainless steel drawband'''
 
;(10) [[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems#ASMSEALANT |'''Sealant''']]: Apply an acceptable sealant between flashing and penetration.  See [http://rpm.rcabc.org/index.php?title=RoofStar_Guarantee_Standards_for_Architectural_Sheet_Metal_(ASM)_Systems#Penetrations_and_Vents '''11.3.3''' ('''5''')].
 
;(11) '''Water-tight storm collar''': Installed by other trade (new construction only) or as required in this Standard.  See [http://rpm.rcabc.org/index.php?title=RoofStar_Guarantee_Standards_for_Architectural_Sheet_Metal_(ASM)_Systems#Penetrations_and_Vents '''11.3.3''' ('''5''')].
 
  
<hr>
+
;(1) [[PVC Roof Systems Standard#PART_6|<big>Air/Vapour Control Layers</big>]]:
 +
:As specified by the ''Design Authority'' and installed to provide continuity for optimal control.
 +
;(2) [[PVC Roof Systems Standard#PART_7|<big>Insulation</big>]]:
 +
:Installed in keeping with Section 7.3.  Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.
 +
;(3) [[PVC Roof Systems Standard#PART_8|<big>Insulation Overlay Panel</big>]]:
 +
:Required for fully adhered membrane systems or when overburden is specified.  Panels must be offset and staggered from underlying insulation panels.
 +
;(4) [[PVC Roof Systems Standard#PART_9|<big>Field Membrane</big>]]:
 +
:See Table 9.2. for permissible application methods and corresponding membrane properties.  Membrane must be installed according to the requirements in Section 9.3.
 +
;(5) [[PVC Roof Systems Standard#PART_10|<big>Edge Securement</big>]]:
 +
:Proprietary to the membrane manufacturer.  Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).
 +
;(6) [[PVC Roof Systems Standard#PART_10|<big>Mechanical Fastening</big>]]:
 +
:Edge securement must be anchored to the roof structure to prevent membrane movement.
 +
;(7) [[PVC Roof Systems Standard#PART_10|<big>Primer or Adhesive</big>]]:
 +
:Proprietary to the membrane manufacturer.  Primer may be required for self-adhered membranes; adhesive is required for all other applications.  All membranes applied to the vertical substrate must be fully adhered.
 +
;(8) [[PVC Roof Systems Standard#PART_10|<big>Membrane Flashing</big>]]:
 +
:May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements).  Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the ''finished roof system surface'', plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.
 +
;(9) [[PVC Roof Systems Standard#PART_10|<big>Primary Surface Reglet Counter-flashing and Sealant</big>]]:
 +
:Surface reglet counter-flashing with bead of sealant applied in reglet cut.  In this illustration, the linear metal flashing serves to secure the membrane.  All membranes applied to a vertical surface must be mechanically fastened.
 +
;(10) [[PVC Roof Systems Standard#PART_10|<big>Secondary Surface Reglet Counter-flashing and Sealant</big>]]:
 +
:Surface reglet counter-flashing with bead of sealant applied in reglet cut.  This flashing provides secondary protection for the primary surface reglet/counter-flashing and safe-guards the sealant from weather-induced deterioration and mechanical damage.
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) Pipe penetration
+
;(A) [[PVC Roof Systems Standard#PART_2|<big>Acceptable Deck</big>]]
 +
:Illustrated deck is representative.  See Sub-section 2.1.5. for acceptable ''deck'' types and conditions.
 +
;(B) [[PVC Roof Systems Standard#PART_2|<big>Wall Structure</big>]]
 +
:Illustrated wall is representative.  Wall control layers (i.e. water resistive barrier) must overlap ''roofing system'' to achieve ''continuity''.  See Sub-section 2.1.7. for wall conditions.
 +
 
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL -->
 
</div><!-- PANEL -->
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
+
 
 +
'''NOTE''': See the [[PVC Roof Systems Standard | '''PVC Roof Systems Standard''']] for additional requirements.
  
 
<hr>
 
<hr>
  
[[RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems|<i class="fa fa-chevron-circle-right fa" ></i> RoofStar Guarantee Standards for Architectural Sheet Metal (ASM) Systems]]
+
[[PVC Roof System Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''PVC Roof System Details'']]
 +
 
 +
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
[[Architectural Sheet Metal Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''ASM Construction Details'']]
+
{{Template:RPM Page Footer with Copyright and Current Date}}

Latest revision as of 15:26, 16 February 2024



Division D - Construction Details


PVC | Membrane Termination F (Wall) ( Article 10.3.2.3.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

PVC Details


10.3.2.3.-PVC-F.png

Drawing NTS

1 WORK INCLUDED

(1) Air/Vapour Control Layers
As specified by the Design Authority and installed to provide continuity for optimal control.
(2) Insulation
Installed in keeping with Section 7.3. Multiple layering illustrated; layers must be offset and staggered at least 304.8 mm (12”) in each direction.
(3) Insulation Overlay Panel
Required for fully adhered membrane systems or when overburden is specified. Panels must be offset and staggered from underlying insulation panels.
(4) Field Membrane
See Table 9.2. for permissible application methods and corresponding membrane properties. Membrane must be installed according to the requirements in Section 9.3.
(5) Edge Securement
Proprietary to the membrane manufacturer. Edge securement is required, irrespective of how the membrane is applied (i.e., adhered, self-adhered, mechanically fastened).
(6) Mechanical Fastening
Edge securement must be anchored to the roof structure to prevent membrane movement.
(7) Primer or Adhesive
Proprietary to the membrane manufacturer. Primer may be required for self-adhered membranes; adhesive is required for all other applications. All membranes applied to the vertical substrate must be fully adhered.
(8) Membrane Flashing
May be run continuously up the vertical substrate from the field or installed as separate flashing (see membrane manufacturer requirements). Membrane shall be carried up the vertical substrate at least 203.2 mm (8”) above the finished roof system surface, plus at least 76.2 mm (3”) for wall control layer overlap. In regions where heavy snow accumulation is possible, or to accommodate future roof membrane replacement, membrane should be carried at least 304.8 mm (12”) up the vertical substrate.
(9) Primary Surface Reglet Counter-flashing and Sealant
Surface reglet counter-flashing with bead of sealant applied in reglet cut. In this illustration, the linear metal flashing serves to secure the membrane. All membranes applied to a vertical surface must be mechanically fastened.
(10) Secondary Surface Reglet Counter-flashing and Sealant
Surface reglet counter-flashing with bead of sealant applied in reglet cut. This flashing provides secondary protection for the primary surface reglet/counter-flashing and safe-guards the sealant from weather-induced deterioration and mechanical damage.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
Illustrated deck is representative. See Sub-section 2.1.5. for acceptable deck types and conditions.
(B) Wall Structure
Illustrated wall is representative. Wall control layers (i.e. water resistive barrier) must overlap roofing system to achieve continuity. See Sub-section 2.1.7. for wall conditions.

NOTE: See the PVC Roof Systems Standard for additional requirements.