EPDM Details:D2.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)
EPDM Details:D2.7.4-3 Counter-flashings & Reglets (Stucco Wall: Re-roofing)
Revision as of 18:35, 8 August 2016 by James Klassen (talk | contribs) (James Klassen moved page EPDM Details:D2.7.9 Counter-flashings & Reglets (Stucco Wall: Re-roofing) to EPDM Details:D2.7.10 Counter-flashings & Reglets (Stucco Wall: Re-roofing): numbering change)
NOTE: This page is under construction. Refer to the SBS Membrane Construction Details for similar application illustrations and requirements.