Difference between revisions of "EPDM Details:D2.7.8-3 Water & Drainage (Clamping Spun Copper Drain)"

Jump to: navigation, search

Difference between revisions of "EPDM Details:D2.7.8-3 Water & Drainage (Clamping Spun Copper Drain)"

Line 13: Line 13:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;1) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMSUBSTRATES|'''Gypsum Deck Overlay''']]: May be required depending on insulation thickness  or when required as a thermal barrier by design authority.
+
;1) [[RoofStar Guarantee Standards forEPDM Roof Assemblies#EPDMSUBSTRATES|'''Gypsum Deck Overlay''']]: May be required depending on insulation thickness  or when required as a thermal barrier by design authority.
;(2) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMVAPOUR|'''Vapour Retarder''']]: If required by design authority.
+
;(2) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMVAPOUR|'''Vapour Retarder''']]: If required by design authority.
;(3) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMINSULATION|'''Insulation''']]: Mechanically attached. Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
+
;(3) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMINSULATION|'''Insulation''']]: Mechanically attached. Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
;(4) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMMEMBRANE|'''Single-ply Membrane''']]: Installed according to manufacturer's instructions and ''RoofStar Guarantee Standards''.
+
;(4) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMMEMBRANE|'''Single-ply Membrane''']]: Installed according to manufacturer's instructions and ''RoofStar Guarantee Standards''.
 
;(5) '''Mastic''': Compatible mastic or sealant.
 
;(5) '''Mastic''': Compatible mastic or sealant.
;(6) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMSTRIPPING|'''Membrane Flashing''']]: Adhered according to manufacturer's printed specifications using proprietary adhesive. Thermoset membrane may be joined using uncured tape or proprietary adhesive;
+
;(6) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMSTRIPPING|'''Membrane Flashing''']]: Adhered according to manufacturer's printed specifications using proprietary adhesive. Thermoset membrane may be joined using uncured tape or proprietary adhesive;
  
 
<hr>
 
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
;(A) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMDECKS|'''Acceptable Deck''']]
+
;(A) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMDECKS|'''Acceptable Deck''']]
 
;(B) '''Clamping Copper Drain''': Mechanically fastened and coated with adhesive as required by manufacturer. Installed over compatible sealant.
 
;(B) '''Clamping Copper Drain''': Mechanically fastened and coated with adhesive as required by manufacturer. Installed over compatible sealant.
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->

Revision as of 16:46, 23 October 2017

RoofStar Guarantee Standards are blue-linked
EPDM Details

6.3.5.1.jpg

1 WORK INCLUDED

1) Gypsum Deck Overlay
May be required depending on insulation thickness or when required as a thermal barrier by design authority.
(2) Vapour Retarder
If required by design authority.
(3) Insulation
Mechanically attached. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
(4) Single-ply Membrane
Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
(5) Mastic
Compatible mastic or sealant.
(6) Membrane Flashing
Adhered according to manufacturer's printed specifications using proprietary adhesive. Thermoset membrane may be joined using uncured tape or proprietary adhesive;

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Clamping Copper Drain
Mechanically fastened and coated with adhesive as required by manufacturer. Installed over compatible sealant.

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.

  • Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C.