Difference between revisions of "EPDM Details:D2.7.8-3 Water & Drainage (Clamping Spun Copper Drain)"

Jump to: navigation, search

Difference between revisions of "EPDM Details:D2.7.8-3 Water & Drainage (Clamping Spun Copper Drain)"

(Created page with "'''NOTE''': This page is under construction. Refer to the '''SBS Membrane Construction Details''' for similar application illustrations and requi...")
 
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
'''NOTE''': This page is under construction.  Refer to the [[SBS Construction Details|'''SBS Membrane Construction Details''']] for similar application illustrations and requirements.
+
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
 +
| colspan="2"  | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big>
 +
|}
 +
<div class="panel panel-success">
 +
<div class="panel-heading"><big>'''EPDM Details'''</big></div>
 +
<div class="panel-body">
 +
<div class="col-md-6">
 +
<div style="text-align:center; vertical-align:center">
 +
[[File:6.3.5.1.jpg|class=img-responsive]]
 +
</div>
 +
</div><!-- COL-MD-6 -->
  
 +
<div class="col-md-6">
 +
=== WORK INCLUDED ===
 +
;1) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMSUBSTRATES|'''Gypsum Deck Overlay''']]: May be required depending on insulation thickness  or when required as a thermal barrier by design authority.
 +
;(2) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMVAPOUR|'''Vapour Retarder''']]: If required by design authority.
 +
;(3) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMINSULATION|'''Insulation''']]: Mechanically attached. Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
 +
;(4) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMMEMBRANE|'''Single-ply Membrane''']]: Installed according to manufacturer's instructions and ''RoofStar Guarantee Standards''.
 +
;(5) '''Mastic''': Compatible mastic or sealant.
 +
;(6) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMSTRIPPING|'''Membrane Flashing''']]: Adhered according to manufacturer's printed specifications using proprietary adhesive. Thermoset membrane may be joined using uncured tape or proprietary adhesive;
  
 
<hr>
 
<hr>
  
 +
=== RELATED WORK BY OTHERS ===
 +
;(A) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMDECKS|'''Acceptable Deck''']]
 +
;(B) '''Clamping Copper Drain''': Mechanically fastened and coated with adhesive as required by manufacturer. Installed over compatible sealant.
 +
</div><!-- COL-6-MD -->
 +
</div><!-- PANEL BODY -->
 +
</div><!-- PANEL -->
  
 +
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
 +
* Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C.
 +
 +
<hr>
  
  
[[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''EPDM Application'']]
+
[[RoofStar Guarantee Standards for EPDM Roof Assemblies|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for EPDM Roof Assemblies]]
  
[[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''EPDM Construction Details'']]
+
[[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Construction Details'']]
  
[[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa-2x" ></i> Back to ''Construction Details'']]
+
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]

Latest revision as of 18:30, 23 October 2017

RoofStar Guarantee Standards are blue-linked
EPDM Details

6.3.5.1.jpg

1 WORK INCLUDED

1) Gypsum Deck Overlay
May be required depending on insulation thickness or when required as a thermal barrier by design authority.
(2) Vapour Retarder
If required by design authority.
(3) Insulation
Mechanically attached. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
(4) Single-ply Membrane
Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
(5) Mastic
Compatible mastic or sealant.
(6) Membrane Flashing
Adhered according to manufacturer's printed specifications using proprietary adhesive. Thermoset membrane may be joined using uncured tape or proprietary adhesive;

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Clamping Copper Drain
Mechanically fastened and coated with adhesive as required by manufacturer. Installed over compatible sealant.

NOTE: Refer to RoofStar Guarantee Standards for additional requirements.

  • Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C.


RoofStar Guarantee Standards for EPDM Roof Assemblies

Back to EPDM Construction Details

Back to Construction Details