Difference between revisions of "EPDM Details:D2.7.8-3 Water & Drainage (Clamping Spun Copper Drain)"
Difference between revisions of "EPDM Details:D2.7.8-3 Water & Drainage (Clamping Spun Copper Drain)"
(Created page with "'''NOTE''': This page is under construction. Refer to the '''SBS Membrane Construction Details''' for similar application illustrations and requi...") |
|||
Line 1: | Line 1: | ||
− | ''' | + | [[File:6.3.5.1.jpg]] |
+ | |||
+ | |||
+ | |||
+ | === WORK INCLUDED === | ||
+ | ;1) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMSUBSTRATES|'''Gypsum Deck Overlay''']]: May be required depending on insulation thickness or when required as a thermal barrier by design authority. | ||
+ | ;(2) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMVAPOUR|'''Vapour Retarder''']]: If required by design authority. | ||
+ | ;(3) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMINSULATION|'''Insulation''']]: Mechanically attached. Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual. | ||
+ | ;(4) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMMEMBRANE|'''Single-ply Membrane''']]: Installed according to manufacturer's instructions and ''RoofStar Guarantee Standards''. | ||
+ | ;(5) '''Mastic''': Compatible mastic or sealant. | ||
+ | ;(6) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMSTRIPPING|'''Membrane Flashing''']]: Adhered according to manufacturer's printed specifications using proprietary adhesive. Thermoset membrane may be joined using uncured tape or proprietary adhesive; | ||
+ | |||
+ | <hr> | ||
+ | |||
+ | === RELATED WORK BY OTHERS === | ||
+ | ;(A) [[RoofStar Guarantee Standards for EPDM Roof Systems#EPDMDECKS|'''Acceptable Deck''']] | ||
+ | ;(B) '''Clamping Copper Drain''': Mechanically fastened and coated with adhesive as required by manufacturer. Installed over compatible sealant. | ||
+ | |||
+ | |||
+ | '''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements. | ||
+ | * Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C. | ||
Line 7: | Line 27: | ||
− | [[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa | + | [[Section:D. Application: Low Slope Roofs|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Application'']] |
− | [[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa | + | [[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Construction Details'']] |
− | [[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa | + | [[Section:G. Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']] |
Revision as of 18:22, 8 August 2016
1 WORK INCLUDED
- 1) Gypsum Deck Overlay
- May be required depending on insulation thickness or when required as a thermal barrier by design authority.
- (2) Vapour Retarder
- If required by design authority.
- (3) Insulation
- Mechanically attached. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
- (4) Single-ply Membrane
- Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
- (5) Mastic
- Compatible mastic or sealant.
- (6) Membrane Flashing
- Adhered according to manufacturer's printed specifications using proprietary adhesive. Thermoset membrane may be joined using uncured tape or proprietary adhesive;
2 RELATED WORK BY OTHERS
- (A) Acceptable Deck
- (B) Clamping Copper Drain
- Mechanically fastened and coated with adhesive as required by manufacturer. Installed over compatible sealant.
NOTE: Refer to RoofStar Guarantee Standards for additional requirements.
- Leader size is determined by design authority using the calculation found in the BC Building Code at Appendix P.7.4.10 and Section 7.4.10.11 (Section 7.4.10.10 for gutters) in conjunction with the 15 minute rainfall value from the National Building Code, Appendix C.