Difference between revisions of "EPDM Protected Roof Assembly (Typical)"

Jump to: navigation, search

Difference between revisions of "EPDM Protected Roof Assembly (Typical)"

Line 42: Line 42:
 
<hr>
 
<hr>
  
[[EPDM Roof Systems Standard|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for EPDM Membrane Systems]]
+
[[EPDM Roof Systems Standard|<i class="fa fa-chevron-circle-left fa" ></i> Standard for EPDM Membrane Systems]]
  
 
[[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Construction Details'']]
 
[[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Construction Details'']]
  
 
{{Tempate:RPM Page Footer with Copyright and Current Date}}
 
{{Tempate:RPM Page Footer with Copyright and Current Date}}

Revision as of 14:36, 30 August 2021

RoofStar Guarantee Standards are blue-linked
EPDM Details

6.3.3.1.jpg

1 WORK INCLUDED

(1) Protection Mat
Provide protection between concrete deck and membrane with installation of manufacturer specified and RGC accepted protection mat or deck overlay boards.
(2) Single-ply Membrane
Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
(3) Adhesive
Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
(4) Membrane Lap
EPDM (thermoset) membrane may be joined using uncured tape or proprietary adhesive.
(5) Fasteners
Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification). May vary from drawing.
(6) Membrane Flashing
Adhered according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface. Adhered to primary membrane.
(7) Insulation
Mechanically attached. Installed according to RoofStar Guarantee Standards. See available insulation products in the Accepted Materials section of this Manual.
(8) Filter Fabric
Metal base flashing required.
(9) Metal Flashing
As required by RoofStar Guarantee Standards.
(10) Ballast
Gravel or concrete paving tiles.
(11) Parapet Flashing
As required by RoofStar Guarantee Standards.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Acceptable Parapet Surface
Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer.
(C) Sloped Wood Blocking

NOTE: See the Standard for additional requirements.