Difference between revisions of "EPDM Protected Roof Assembly (Typical)"

Jump to: navigation, search

Difference between revisions of "EPDM Protected Roof Assembly (Typical)"

 
(19 intermediate revisions by the same user not shown)
Line 1: Line 1:
{| class="wikitable" | style="color: black; background-color: orange; width: 100%;text-align:center"
+
{{Template:RPM Info}}
| colspan="2"  | <big>'''''RoofStar Guarantee Standards''''' are <span style="color:#6495ed">'''blue-linked'''</span></big>
+
 
|}
+
{{DISPLAYTITLE:<span style="position: absolute; clip: rect(1px 1px 1px 1px); clip: rect(1px, 1px, 1px, 1px);">{{FULLPAGENAME}}</span>}}
 +
__NOTOC__
 +
 
 +
<big><big>Division D - Construction Details</big></big>
 +
<hr>
 +
<big><big><big><big><big>EPDM | Protected Membrane Roof Assembly (Typical) ([[EPDM_Roof_Systems_Standard#1.1.3.1._Permitted_Roof_Systems | Article 1.1.3.1.]])</big></big></big></big></big>
 +
{{Template:Construction Details Header}}
 
<div class="panel panel-success">
 
<div class="panel panel-success">
 
<div class="panel-heading"><big>'''EPDM Details'''</big></div>
 
<div class="panel-heading"><big>'''EPDM Details'''</big></div>
Line 13: Line 19:
 
<div class="col-md-6">
 
<div class="col-md-6">
 
=== WORK INCLUDED ===
 
=== WORK INCLUDED ===
;(1) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMPROTECTION|'''Protection Mat''']]: Provide protection between concrete deck and membrane with installation of manufacturer specified and RGC accepted protection mat or deck overlay boards.
+
;(1) [[EPDM Roof Systems Standard#PART_9 |'''Protection Mat''']]: Provide protection between concrete deck and membrane with installation of manufacturer specified and RGC accepted protection mat or deck overlay boards.
;(2) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMMEMBRANE|'''Single-ply Membrane''']]: Installed according to manufacturer's instructions and ''RoofStar Guarantee Standards''.
+
;(2) [[EPDM Roof Systems Standard#PART_9 |'''Single-ply Membrane''']]: Installed according to manufacturer's instructions and ''RoofStar Guarantee Standards''.
;(3) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMADHESIVE|'''Adhesive''']]: Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
+
;(3) [[EPDM Roof Systems Standard#PART_9 |'''Adhesive''']]: Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
 
;(4) '''Membrane Lap''': EPDM (thermoset) membrane may be joined using uncured tape or proprietary adhesive.
 
;(4) '''Membrane Lap''': EPDM (thermoset) membrane may be joined using uncured tape or proprietary adhesive.
 
;(5) '''Fasteners''': Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification).  May vary from drawing.
 
;(5) '''Fasteners''': Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification).  May vary from drawing.
;(6) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMSTRIPPING|'''Membrane Flashing''']]: Adhered according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface. Adhered to primary membrane.
+
;(6) [[EPDM Roof Systems Standard#PART_10 |'''Membrane Flashing''']]: Adhered according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface. Adhered to primary membrane.
;(7) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMINSULATION|'''Insulation''']]: Mechanically attached. Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Roof Deck Insulation|'''Accepted Materials''']] section of this Manual.
+
;(7) [[EPDM Roof Systems Standard#PART_7|'''Insulation''']]: Mechanically attached. Installed according to ''RoofStar Guarantee Standards''. See available insulation products in the [[Division C | Division C]] of this Manual.
;(8) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMFILTER|'''Filter Fabric''']]:  Metal base flashing required.
+
;(8) [[EPDM Roof Systems Standard#PART_14|'''Filter Fabric''']]:  Metal base flashing required.
;(9) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#METALCAP-EPDM|'''Metal Flashing''']]: As required by ''RoofStar Guarantee Standards''.
+
;(9) [[EPDM Roof Systems Standard#PART_13|'''Metal Flashing''']]: As required by ''RoofStar Guarantee Standards''.
;(10) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMBALLAST|'''Ballast''']]: Gravel or concrete paving tiles.
+
;(10) [[EPDM Roof Systems Standard#PART_3|'''Ballast''']]: Gravel or concrete paving tiles.
 
+
;(11) [[EPDM Roof Systems Standard#PART_13|'''Parapet Flashing''']]: As required by ''RoofStar Guarantee Standards''.
(11) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#METALCAP-EPDM|'''Parapet Flashing''']]: As required by ''RoofStar Guarantee Standards''.
 
  
 
<hr>
 
<hr>
  
 
=== RELATED WORK BY OTHERS ===
 
=== RELATED WORK BY OTHERS ===
 
+
;(A) [[EPDM Roof Systems Standard#PART_2|'''Acceptable Deck''']]
;(A) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMDECKS|'''Acceptable Deck''']]
+
;(B) [[EPDM Roof Systems Standard#PART_10|'''Acceptable Parapet Surface''']]: Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer.
;(B) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMWALLSUB|'''Acceptable Parapet Surface''']]: Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer.
+
;(C) [[EPDM Roof Systems Standard#PART_13|'''Sloped Wood Blocking''']]  
;(C) [[RoofStar Guarantee Standards for EPDM Roof Assemblies#EPDMWOODBLOCKING|'''Sloped Wood Blocking''']]  
 
 
</div><!-- COL-6-MD -->
 
</div><!-- COL-6-MD -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL BODY -->
 
</div><!-- PANEL -->
 
</div><!-- PANEL -->
  
'''NOTE''': Refer to '''''RoofStar Guarantee Standards''''' for additional requirements.
+
'''NOTE''': See the [[EPDM Roof Systems Standard | '''Standard''']] for additional requirements.
  
 
<hr>
 
<hr>
 +
[[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Construction Details'']]
  
 +
[[Main Page | <i class="fa fa-home fa"></i> Home]]
  
[[RoofStar Guarantee Standards for EPDM Roof Assemblies|<i class="fa fa-chevron-circle-left fa" ></i> RoofStar Guarantee Standards for EPDM Roof Assemblies]]
+
{{Tempate:RPM Page Footer with Copyright and Current Date}}
 
 
[[EPDM (Thermoset Membranes) Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''EPDM Construction Details'']]
 
 
 
[[Construction Details|<i class="fa fa-chevron-circle-left fa" ></i> Back to ''Construction Details'']]
 

Latest revision as of 21:33, 27 June 2022



Division D - Construction Details


EPDM | Protected Membrane Roof Assembly (Typical) ( Article 1.1.3.1.)

Notice to Reader
Images used in a Construction Detail are representative and not prescriptive, and are not necessarily drawn to scale. They are intended to support the related Standard (Ref. Division A, Article 2.2.1.2.).

The reader may link to the related Article in the detail title, or link to the Standard as it relates to a specific element in the detail. All hyperlinks are displayed blue text.

EPDM Details

6.3.3.1.jpg

1 WORK INCLUDED

(1) Protection Mat
Provide protection between concrete deck and membrane with installation of manufacturer specified and RGC accepted protection mat or deck overlay boards.
(2) Single-ply Membrane
Installed according to manufacturer's instructions and RoofStar Guarantee Standards.
(3) Adhesive
Proprietary, installed according to manufacturer's instructions, usually brushed, rolled or sprayed.
(4) Membrane Lap
EPDM (thermoset) membrane may be joined using uncured tape or proprietary adhesive.
(5) Fasteners
Install according to manufacturer's instructions (style may vary depending on material type and manufacturer's specification). May vary from drawing.
(6) Membrane Flashing
Adhered according to manufacturer's printed specifications using proprietary adhesive. Must be carried to outside of parapet or minimum 200 mm (8") above finished roof surface. Adhered to primary membrane.
(7) Insulation
Mechanically attached. Installed according to RoofStar Guarantee Standards. See available insulation products in the Division C of this Manual.
(8) Filter Fabric
Metal base flashing required.
(9) Metal Flashing
As required by RoofStar Guarantee Standards.
(10) Ballast
Gravel or concrete paving tiles.
(11) Parapet Flashing
As required by RoofStar Guarantee Standards.

2 RELATED WORK BY OTHERS

(A) Acceptable Deck
(B) Acceptable Parapet Surface
Surface must be smooth, dry and clean. Rough surface must be covered with treated plywood, to be determined by design authority or inspector or as required by manufacturer.
(C) Sloped Wood Blocking

NOTE: See the Standard for additional requirements.


Back to EPDM Construction Details

Home

© RCABC 2024
No reproduction of this material, in whole or in part, is lawful without the expressed permission of the RCABC Guarantee Corp.